Aurora, Illinois

File #: 24-0074    Version: 1 Name:
Type: Resolution Status: Passed
File created: 2/1/2024 In control: City Council
On agenda: 2/27/2024 Final action: 2/27/2024
Title: A Resolution to award the 5th Street Water Main Extension project located in Ward 2 to Brandt Excavating, Inc. in the bid amount of two hundred sixty-three thousand three hundred eighty-three Dollars and forty-five Cents ($263,383.45).
Attachments: 1. Exhibit A - Location Map, 2. Exhibit B - Ad for Bid, 3. Exhibit C - Bid Tab, 4. Exhibit D - Contractor Submittal
cover
TO: Mayor Richard C. Irvin


FROM: Kurt Muth, PE, Engineering Coordinator


DATE: February 12, 2024

SUBJECT:
A Resolution to award the 5th Street Water Main Extension project located in Ward 2 to Brandt Excavating, Inc. in the bid amount of two hundred sixty-three thousand three hundred eighty-three Dollars and forty-five Cents ($263,383.45).

PURPOSE:
Water main installation has been deemed necessary on 5th Street between Clark Street and Benton Street to improve water quality and system capacity. An 8" ductile iron water main is being installed where there is currently no water main.

BACKGROUND:
A location map is attached as Exhibit A to show the limits of the project. Closures of entrances to the business will be kept to a minimum during construction. Lead water services within the project corridor will be replaced with the approval of each homeowner.

DISCUSSION:
The proposed improvements have been publicly advertised and bid in conformance with City procedures. The advertisement for bid is attached as Exhibit B. Eight conforming bids were received, publicly opened and read aloud on January 31, 2024. The low bidder, Brandt Excavating, Inc., has successfully completed similar projects for the City in the past. The bid tabulation and the Brandt Excavating, Inc. bid are attached as exhibits C and D.

This contract is subject to the local vendor preference ordinance. However, none of the contractors submitting bids were eligible according to the requirements listed in the ordinance.

The project amount ($263,383.45) is budgeted for in 2024 within account 510-4058-511-73-02 (IC076 & IC080) which has a 2024 budget amount of $5,000,000.


IMPACT STATEMENT:
Traffic will be detoured to adjacent blocks, but the increase in traffic on the adjacent neighboring blocks will be temporary and negligible. Water and sanitary service interruptions will be kept to a minimum during construction of this project.

RECOMMENDATIONS:
I request the proposed resolution a...

Click here for full text