Aurora, Illinois

File #: 22-0248    Version: Name: Super Sudz Aurora, Inc. / 970 N. Lake Street / Final Plan
Type: Resolution Status: Passed
File created: 3/23/2022 In control: City Council
On agenda: 6/28/2022 Final action: 6/28/2022
Title: A Resolution Approving a Final Plan for Lot 2 of Lake Street 31 Development Subdivision located on the west side of N. Lake Street, south of 970 N. Lake Street for Single Bay Car Wash
Attachments: 1. Exhibit "A-1" Final Plan - 2022-06-10 - 2022.080, 2. Exhibit "A-2" Landscape Plan - 2022-05-25 - 2022.080, 3. Fire Access Plan - 2022-03-22 - 2022.080, 4. Land Use Petition and Supporting Documents - 2022-03-22 - 2022.080, 5. Plat of Survey - 2022-03-22 - 2022.080, 6. Fire Access Plan - 2022-06-10 - 2022.080, 7. Address Plat - 2022-03-22 - 2022.080, 8. Qualifying Statement - 2022-05-25 - 2022.080, 9. Review Memo - 2022-06-03 - 2022, 10. Maps, 11. Legistar History Report - 2022-06-10 - 2022.080

cover

TO:                     Mayor Richard C. Irvin

 

FROM:                     Planning and Zoning Commission

 

DATE:                     June 10, 2022

 

SUBJECT:

A Resolution Approving a Final Plan for Lot 2 of Lake Street 31 Development Subdivision located on the west side of N. Lake Street, south of 970 N. Lake Street for Single Bay Car Wash (Super Sudz Aurora, Inc. - 22-0248 / AU15/1-22.080-Fpn - TV - Ward 6)  

 

PURPOSE:

The Petitioner, Super Sudz Aurora, Inc., is requesting approval of a Final Plan for Lot 2 of Lake Street 31 Development Subdivision located on the west side of N. Lake Street, south of 970 N. Lake Street for single bay car wash.  

 

BACKGROUND:

The Subject Property is on Lot 2 of Lake Street 31 Development Subdivision, being 1.703 acres, which is located at the southeast corner of the property at 970 N. Lake Street. It currently is a parking lot of the now vacant Carson Pirie Scott. The property is currently zoned B-3 Business and Wholesale District zoning.

 

The Petitioner is requesting approval of a Final Plan for Lot 2.  The detail of the request includes the construction of a 6,144 square foot single bay car wash.  A car wash is currently a permitted use on this property.  The entrance and exit into the car wash will be via the shared east/west private drive along the south property line. There is stacking for 30 vehicles on site when entering the car wash and 41 parking spaces with self-service vacuum stations.  A new 5' sidewalk is being provided along Lake Street which will be setback 5' from the property line.  Landscaping is being implemented throughout the property including within the newly created 30' setback along Lake Street.

 

The building elevations consists of stone and brick facades accented with a blue metal cornice.  In addition, a metal canopy will be constructed over the parking spaces with self-service vacuum stations.  An 8' tall monument sign will be located along Lake Street at the south portion of the property

 

Concurrently with this proposal, Lake Street 31 Development, LLC, is requesting the establishment of a Conditional Use Planned Development on the entire 970 N. Lake Street. The detail of the request includes the approval of a Plan Description that outlines specific requirements and allows for modifications including certain additional permitted uses, including a list of prohibited uses, and a requirement to market one of the proposed newly created retail units along Lake Street for a fast casual sit-down restaurant at least two years.  It also includes modifications to the bulk restrictions including the establishment of minimum setbacks and codifying parking requirements.

 

Lake Street 31Development, LLC, is also requesting approval of a Final Plat for Lake Street 31 Development Subdivision.  The detail of the request includes subdividing the property into two parcels and granting several easements.  This subdivision will allow for future development at the southeast corner of the property for a proposed car wash.

 

Lastly, the Petitioner is requesting approval of a Final Plan for Lot 1.  The detail of the request includes the redevelopment of the existing building into mix use by repurposing the department store into a temperature and access controlled indoor storage facility with retail units fronting along Lake Street. The storage facility will have a retail/office component and two flex areas that can be rented out to people for office space. 

 

The proposal also reconfigures and upgrades the parking lot by establishing new landscaped areas along the southern and western property lines, landscaped islands throughout the parking lot, and a 30' landscaped setback along Lake Street. Access to the property will be via the existing signalized intersection, a right-in right-out from Lake Street and a new 4-way stop which will be added internally on the shared private drive to slow traffic and improve circulations.  This new 4-way stop will be along the south property line and the shared east/west private drive, directly across from the westerly drive at Northgate.

 

Frontage along Lake Street will be improved. A new 5' sidewalk is being provided along Lake Street which will be setback 5' from the property line.  Landscaping is being implemented along Lake Street, within the parking lot, and along the southern and western sides of the property. There is a total of 187 parking spaces which exceeds the parking requirement.

 

As part of this proposal, the Petitioner is proposing to upgrade the building elevations. The proposed elevation changes include repairing and repainting the existing façade, new aluminum storefronts with fabric and metal awnings.  In addition, the entrances are distinguished by new taller parapets with EIFs or stone veneer.  The Petitioner is also proposing a new canopy with outdoor seating along the south corner of the front façade.  A new 10' tall monument sign will be located along Lake Street. 

 

DISCUSSION:

Staff has reviewed the Final Plan Resolution petition and have sent comments back to the petitioner on those submittals.  The petitioner has made the requested revisions to these documents and they now meet the applicable codes and ordinances, with the exception of the items reflected in the conditions listed in the Staff Recommendation below.  

 

POLICIES AND GUIDELINES:

The Staff’s Evaluation and Recommendation are based on the following Physical Development Policies:

 

10.0 To provide for the orderly, balanced and efficient growth and redevelopment of the City through the positive integration of land-use patterns, functions, and circulation systems. To protect and enhance those assets and values that establishes the desirable quality and general livability of the City. To promote the City’s position as a regional center

 

31.01(1) To promote the concept of a hierarchy of commercial development consisting of regional, community and neighborhood commercial centers supported by requisite population levels, which influence to location, scale and type of commercial development and redevelopment.

 

31.01(3) To promote the development of commercial facilities in existing or planned commercial areas.

 

32.01(4) To enhance the quality of the visual and physical environment of the City through the provision for landscaping in commercial development  

 

RECOMMENDATIONS:

The Planning and Zoning Commission recommended CONDITIONAL APPROVAL of the Resolution Approving a Final Plan for Lot 2 of Lake Street 31 Development Subdivision located on the west side of N. Lake Street, south of 970 N. Lake Street for Single Bay Car Wash, with the following conditions:

 

1. That the Final Plan approval be contingent upon Final Engineering approval.

 

2. That the access on Lake Street be contingent upon Illinois Department of Transportation (IDOT) review and approval. The existing traffic signal post at the southeast corner of the site may need to be relocated and additional dedication may be required as determined by IDOT.

 

3. That the documents be revised to incorporate the Zoning and Planning Staff comments included in the memo dated June 2, 2022, prior to building permit issuance. 

 

ATTACHMENTS:

Exhibit "A-1" Final Plan

Exhibit "A-2" Landscape Plan

Exhibit “A-3” Building and Signage Elevations

Land Use Petition with Supporting Documents

Maps

 

Legistar Number: 22-0248

 

cc:                     

Alderman Michael B. Saville, Chairperson

Alderwoman Patty Smith, Vice Chairperson

Alderman Carl Franco

Alderman Sherman Jenkins

Alderman Ron Woerman

 

 

CITY OF AURORA, ILLINOIS

 

RESOLUTION NO. _________

DATE OF PASSAGE ________________

title

A Resolution Approving a Final Plan for Lot 2 of Lake Street 31 Development Subdivision located on the west side of N. Lake Street, south of 970 N. Lake Street for Single Bay Car Wash  

body

WHEREAS, the City of Aurora has a population of more than 25,000 persons and is, therefore, a home rule unit under subsection (a) of Section 6 of Article VII of the Illinois Constitution of 1970; and

 

WHEREAS, subject to said Section, a home rule unit may exercise any power and perform any function pertaining to its government and affairs for the protection of the public health, safety, morals, and welfare; and

 

WHEREAS, by petition dated March 23, 2022, Super Sudz Aurora, Inc. filed with the City of Aurora a petition Requesting approval of a Final Plan for Lot 2 of Lake Street 31 Development Subdivision located on the west side of N. Lake Street, south of 970 N. Lake Street for Single Bay Car Wash and related required documents as attached hereto as Exhibits "A-1" through Exhibit “A-3”; and

 

WHEREAS, the Planning and Zoning Commission conducted a hearing on June 8, 2022, reviewed the petition and recommended CONDITIONAL APPROVAL of said petition; and

 

WHEREAS, on June 15, 2022, the Building, Zoning and Economic Development Committee of the Aurora City Council reviewed said Final Plan and the before mentioned recommendations and recommended CONDITIONAL APPROVAL of said petition; and 

 

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Aurora, Illinois, finds as facts all of the preamble recitals of this Resolution and hereby grants CONDITIONAL APPROVAL of said Final Plan with the following conditions:

 

1. That the Final Plan approval be contingent upon Final Engineering approval.

 

2.  That the access on Lake Street be contingent upon Illinois Department of Transportation (IDOT) review and approval. The existing traffic signal post at the southeast corner of the site may need to be relocated and additional dedication may be required as determined by IDOT.

 

BE IT FURTHER RESOLVED that the City Council of the City of Aurora hereby adopts the Final Plan and related required documents, as attached hereto as Exhibit "A-1" Final Plan, Exhibit “A-2” Landscape Plan, and Exhibit “A-3” Building and Signage Elevations, along with any easement dedications deemed necessary by the Aurora City Engineer.