cover
TO: Mayor Richard C. Irvin

FROM: Ian Wade, Capital Projects Manager

DATE: August 12, 2021

SUBJECT:
A resolution authorizing the Director of Purchasing to enter into an agreement with Lite Construction, Inc., 711 S. Lake Street, Montgomery, IL 60538 for the New York Street Bridge Stairs in the amount of $144,902.00.

PURPOSE:
To improve the aesthetics and safety of the stairway connecting the New York Street Bridge to the Fox River Trail by entering into an agreement with Lite Construction, Inc. in the amount of $144,902.00 for repairs and reconstruction.

BACKGROUND:
The staircase from New York Street to the Fox River Trail is in substantial disrepair. The proposed reconstruction consists of replacing the stringers, treads, and railing (railing to match existing) and installing new precast concrete, removable, open treads. The existing concrete support piers, which are decorative and in good condition, will be left in place to be reused. This design was approved by the FoxWalk Overlay District Design Review Committee on October 10, 2019.

To help fund this project, the City applied for and received a grant from the Illinois Department of Natural Resources' Recreational Trails Program in Fall 2018. This grant, which is attached to this memo, will reimburse the City 80% of up to $175,000 in design and construction costs.

DISCUSSION:
Bids for the New York Street Bridge Stairs were received from two contractors (see attached bid tabulation). The apparent low bidder was Lite Construction, Inc., 711 S. Lake Street, Montgomery, IL 60538 in the amount of $144,902.00, which includes the base bid ($128,457), an additional 10% of the base bid as a contingency ($12,845), and four (4) additional precast treads ($3,600). Note that these four (4) additional treads combined with the six (6) that were included in the base bid will result in an inventory of ten (10) total spare treads for future maintenance/replacement by the City.

The account to be used to front fund...

Click here for full text