Aurora, Illinois

File #: 19-0016    Version: 2 Name:
Type: Resolution Status: Passed
File created: 1/7/2019 In control: City Council
On agenda: 2/12/2019 Final action: 2/12/2019
Title: A Resolution to authorize a Professional Services Agreement for professional engineering consulting services for a citywide potable water system capacity analysis for the Water Production Division
Attachments: 1. CMT - Capacity Analysis Proposal - Jan 2019.pdf
cover
TO: Mayor Richard C Irvin

FROM: David E. Schumacher, P.E., Superintendent of Water Production

DATE: January 23, 2019

SUBJECT:
Resolution to authorize a Professional Services Agreement for professional engineering consulting services for a citywide potable water system capacity analysis for the Water Production Division

PURPOSE:
To obtain City Council approval for a professional engineering services agreement with Crawford, Murphy & Tilly, Inc., Aurora, IL (CMT) for professional engineering consulting services for a citywide potable water system capacity analysis.

BACKGROUND:
The City of Aurora has been providing potable water to its residents since the late 1840's. The methods of treatment and distribution have changed over the years. On a reoccurring basis, engineering analyses are performed to plan for future city development, changing regulatory rules, and various other reasons. The last full citywide potable water system analysis was completed in 2007 via a Water Master Plan Update.

CMT has been providing potable water system planning, design, and construction engineering services for the city for over 40 years. Their work has included municipal raw water wells and associated wellhouses, the river intake, well collector mains, the water treatment plant, finished water transmission mains, various booster/pump stations, and storage tanks. CMT most recently completed an update of the hydraulic model of the potable water distribution system in 2017.

DISCUSSION:
As more customers purchase water-saving fixtures and use water-saving practices, city resident's overall potable water use, even with an ever increasing population, has leveled off over the past decade. This trend has created a situation where existing operational capital infrastructure may have underutilized capacity. As such, the city is interested in exploring possibilities of selling potable water to others on a wholesale basis.

In order to investigate this possibility, a capacity...

Click here for full text