Aurora, Illinois

File #: 14-00309    Version: 1 Name:
Type: Resolution Status: Passed
File created: 4/15/2014 In control: City Council
On agenda: 5/13/2014 Final action: 5/13/2014
Title: A Resolution requesting the award of the lowest qualified bid for city hall HVAC upgrades to Mechanical, Inc. of Freeport, Illinois in the amount of $172,500.
cover
TO: Mayor Thomas J. Weisner

FROM: Jim Pilmer, Director of Neighborhood Standards

DATE: April 15, 2014

SUBJECT:
A Resolution requesting the award of the lowest qualified bid for city hall HVAC upgrades to Mechanical, Inc. of Freeport, Illinois in the amount of $172,500 for Finance Committee on April 22, 2014.

PURPOSE:
Over the past two decades through major renovations, HVAC upgrades were made to floors one, two, four and five of city hall. Kluber Engineering of Batavia, IL has completed other HVAC projects at city hall and designed this system to meet the intended results. Kluber began the plan design on January 30, 2014. Four field meetings were conducted to prepare the bid specifications and engineered drawings. A request for proposal was published on March 23, 2014, a mandatory pre-bid meeting held on March 31, 2014, and publically opened bids were on April 9, 2014 by the City Clerk. Four bids were submitted and the base bid range was from $166,000 to $224,500. Kluber conducted a Bid Qualification and Scope Review with Mechanical, Inc. and found the bid to be responsive and complete.

BACKGROUND:
This HVAC upgrade is the most cost effective system and construction method for this project. It will not require the demolition of the ceilings and walls for duct work and the upgrades. This system installation allows for construction savings of over $100,000. The bid specifications and the low bid received is the most energy efficient system available in the market. The system is controlled by thermostats in each work area, is quiet, has fresh air exchange and will remove the need for the antiquated radiators in each work area and the final window air conditioning units will be removed from city hall. The upgrade will be tied into the existing control system for city hall. The upgrade will include Alternate No. One, the tie into the existing control system for city hall in the amount of $6,500.00.

DISCUSSION:
The project will commen...

Click here for full text