Aurora, Illinois

File #: 15-00409    Version: Name: Aurora Corporate Center / Beverly Drive / Final Plan - Variances
Type: Resolution Status: Passed
File created: 5/6/2015 In control: City Council
On agenda: 7/14/2015 Final action: 7/14/2015
Title: A Resolution Approving a Final Plan on Condo Lot 4 of Lot 5 of Aurora Corporate Center Subdivision and Granting a Setback Variance for property located along the east side of Beverly Drive, south of Ginger Woods Parkway, Aurora, Illinois, 60502
Attachments: 1. Exhibt "A-1" Final Plan - 2015-06-10 - 2015.024.pdf, 2. Exhibt "A-2" Landscape Plan - 2015-06-10 - 2015.024.pdf, 3. Exhibt "A-3" Elevations - 2015-06-10 - 2015.024.pdf, 4. Exhibt "A-4" Fire Access Plan - 2015-06-10 - 2014.024.pdf, 5. Property Research Sheet - 2015-01-29 - 2015.024.pdf, 6. Land Use Petition and Supporting Documents - 2015-05-05 - 2015.024.pdf, 7. Condominium Declarations - 2015-05-05 - 2015.024.pdf, 8. Recorded Plats - 2015-05-05 - 2015.024.pdf, 9. Legistar History Report - 2015-06-19 - 2015.024.pdf
cover
TO: Mayor Thomas J. Weisner

FROM: Planning Commission

DATE: June 18, 2015

SUBJECT:
A Resolution Approving a Final Plan on Condo Lot 4 of Lot 5 of Aurora Corporate Center Subdivision and Granting a Setback Variance for property located along the east side of Beverly Drive, south of Ginger Woods Parkway, Aurora, Illinois, 60502 (Aurora Corporate Center Development Company - L15-00409 / AU01/2-15.024-Fpn/V - TV - Ward 1)

PURPOSE:
The Petitioner, Aurora Corporate Center Development Company is requesting approval of a Final Plan with a setback variance on 2.318, being Condo Lot 4 of Lot 5, in the Aurora Corporate Center which includes construction of 38,626 square foot multi-tenant contractor building.

BACKGROUND:
The Subject Property is generally located along the east side of Beverly Drive, south of Ginger Woods Parkway and is currently vacant property with PDD Planned Development District zoning, which is part of the Farnsworth International Special Use Planned Development. The Aurora Corporate Subdivision was approved in 2000. The Subject Property was designated as Lot 5. Then in 2008, a Condominium Plat for Lot 5 was recorded creating 4 condo lots.

The details of the proposal includes the construction of a 38,626 square foot multi-tenant contractor building on Condo Lot 4 with 10 truck doors on the north side of the building. There will be a total of 103 automobile parking spaces, of which 4 are handicapped.

As part of this Petition, the Petitioner is requesting a setbacks variance along the south and east property line. The setback along the south property line will be reduced from 8' to 4.35', being a 3.65' variance and the setback along the east property line will be reduced from 15' to 0', being a 15' variance.

Access to the site will be from Beverly Drive via the private roadways which have already been constructed. A five-foot wide concrete sidewalk will be constructed along Beverly Drive abutting this property...

Click here for full text