Skip to main content

Aurora, Illinois

File #: 22-0050    Version: 1 Name:
Type: Resolution Status: Passed
File created: 1/21/2022 In control: City Council
On agenda: 2/22/2022 Final action: 2/22/2022
Title: A Resolution Authorizing a Contract with Trotter and Associates, Inc., to provide construction engineering services for various underground utility improvement projects during the 2022 construction season, in an amount not to exceed $390,712.60.
Attachments: 1. Exhibit A - Ad for Bid, 2. Exhibit B - RFQ Results Summary, 3. Exhibit C - Trotter PSA Rev
cover
TO: Mayor Richard C. Irvin

FROM: Kurt Muth, P.E., Engineering Coordinator

DATE: February 7, 2022

SUBJECT:
A resolution authorizing the Director of Purchasing to execute a contract with Trotter and Associates, Inc. to provide construction engineering services for various underground utility installation and repair projects on an as-needed basis during the 2022 construction season, in an amount not to exceed $390,712.60. The projects will be located throughout the City and will include the repair or installation of water mains, sanitary sewers, storm sewers, and the replacement of lead water services.

PURPOSE:
To execute a contract to allow Trotter and Associates, Inc., to provide services to supplement City staff throughout the 2022 construction season. Personnel from Trotter and Associates, Inc., have successfully provided similar services in past. This proposal allows for a full time representative during the 2022 construction season of March-December and a second representative if an IEPA forgivable loan is obtained and a lead water service line replacement project proceeds from July 2022 into 2023.

BACKGROUND:
Due to the complex nature of underground utility construction, it is recommended that a representative of the City be on-site to review the construction procedures and ensure that the new utilities are installed in conformance with the design plans and specifications. The City published a request for qualifications that was advertised on December 26, 2021 and fifteen firms submitted statements of qualifications. A copy of the advertisement is attached as Exhibit A. After review of the proposals by engineering division staff, Trotter and Associates, Inc., was found to be the most qualified. A summary of the rankings of the top three firms as determined by three of the City's professional engineers is attached as Exhibit B. Trotter and Associates, Inc., was asked to submit a draft agreement for review and approval, which is attached as Ex...

Click here for full text