File #: 26-0138    Version: 3 Name:
Type: Resolution Status: Forwarded to Committee of the Whole
File created: 2/25/2026 In control: Infrastructure and Technology Committee
On agenda: 3/9/2026 Final action:
Title: A Resolution to award the Star Ave Water Main Replacement Project, located in Ward 1, to Gerardi Water & Sewer Co., in the bid amount of $467,106.00.
Attachments: 1. Exhibit A - Star Ave Location Map, 2. Exhibit B - Star Ave Water Main Posted Bid Document, 3. Exhibit C - Star Ave. Water Main Replacement Bid Tab, 4. Exhibit D - Star Ave Submitted Bid
cover
TO: Mayor John Laesch

FROM: Stephen Wong, P.E. Professional Engineer

DATE: March 9, 2026

SUBJECT:
A Resolution to award the Star Ave Water Main Replacement Project, located in Ward 1, to Gerardi Water & Sewer Co., in the bid amount of $467,106.00.

PURPOSE:
To replace the existing water main on Star Avenue which has a history of frequent breaks.

BACKGROUND:
The location of the water main to be replaced can be seen in the attachment, Exhibit A - Location Map. There is a total of 16 water services from the existing water main that will be replaced and switched over to the new main, most of which are currently lead service lines.

DISCUSSION:
A total of eight bids were received on February 25, 2026. Attached are Exhibits B & C, the posted bid documents and the bid tabulation. Gerardi Water & Sewer Co.'s submitted bid can be seen in the attached Exhibit D. The lowest responsible bid received was in the amount of $467,106.00 by Gerardi Water & Sewer Co.

The water main improvements will be funded with account 510-4058-511-73-02 (IC076) for $467,106.00 which has a 2026 budget amount of $5,000,000.00.

This project was subject to the Local Preference Ordinance, however no local contractors submitted.

IMPACT STATEMENT:
Traffic will be detoured to adjacent blocks, but the increase in traffic on the adjacent neighboring blocks will be temporary and negligible. Water and sanitary service interruptions will be kept to a minimum during construction of this project. Impacts on traffic and residents will be kept to a minimum with parking restrictions as required. Water shutdowns during the project will be planned and coordinated with the residents affected.

RECOMMENDATIONS:
I request the proposed resolution awarding the contract to Gerardi Water & Sewer Co. in the bid amount of four hundred and sixty-seven thousand, one hundred and six dollars and zero cents ($467,106.00) be adopted.


cc: Infrastructure and Technology Committee



CITY OF AURORA, ILLINOIS

RESOLU...