Aurora, Illinois

File #: 18-0264    Version: 1 Name:
Type: Resolution Status: Passed
File created: 3/21/2018 In control: City Council
On agenda: 4/10/2018 Final action: 4/10/2018
Title: A Resolution to accept a bid from Copenhaver Construction, Inc, 75 Koppie Drive, Gilberts, IL 60136 for the Water Street Mall Improvements Project in the amount of $277,835.
Attachments: 1. Copenhaver Bid, 2. Bid Tabulation.pdf, 3. Water Street Presentation 2018-03-15.pdf
cover
TO: Mayor Richard C. Irvin

FROM: Ian Wade, Capital Projects Manager

DATE: March 27, 2018

SUBJECT:
A resolution to accept a bid from Copenhaver Construction, Inc, 75 Koppie Drive, Gilberts, IL 60136 for the Water Street Mall Improvements Project in the amount of $277,835.

PURPOSE:
To accept the bid for the above referenced project.

BACKGROUND:
To address the mismatched aesthetics and safety concerns which exist currently, the City is proposing the reconstruction of the Water Street Mall between Downer Place and Galena Boulevard. Some of the highlights of the project include removal of all existing hardscapes (abandoned utility protrusions, concrete and pavers) and placement of new "plaza" concrete (similar to River's Edge Park with sections of color) and a ribbon of brick pavers (to match current and surrounding brick), four new planter beds (including one at the south end/Downer), and a blended, arching transition to the mall from the walkway currently meandering through the park area on the east side of the mall

It should be noted that supplemental items including landscaping improvements and string lighting are anticipated, but will be implemented separately (much of which will be performed by City forces and resident groups) and are not part of the hardscape construction to be performed as part of the initial project. The estimated costs for these items is between $85,000 and $95,000, which does not include City labor and equipment to be used

DISCUSSION:
Bids for the Water Street Mall Improvements were received from seven contractors (Exhibit A). The lowest responsible bidder was Copenhaver Construction, Inc, 75 Koppie Drive, Gilberts, IL 60136 for the Water Street Mall Improvements Project in the amount of $277,835, which includes the Bid Alternate for Decorative Concrete. Combining this amount with the above landscaping and string lighting costs results in an estimated project cost of around $370,000. This will be funded from account 231-4430-4...