File #: 15-00112    Version: 1 Name:
Type: Resolution Status: Passed
File created: 2/11/2015 In control: City Council
On agenda: 2/24/2015 Final action: 2/24/2015
Title: A Resolution to award a Contract to Superior Excavating Company of P.O. Box 575, Channahon, IL 60410 for the East Galena Blvd. and New York St. Sewer Separation from Root St. to Smith St. project in the amount of three million, nine hundred forty seven thousand, and seventy nine dollars ($3,947,079.00).
Sponsors: Public Works
cover
TO: Mayor Thomas J. Weisner

FROM: Graig Neville, Engineer

DATE: February 11, 2015

SUBJECT:
A resolution to award a Contract to Superior Excavating Company of P.O. Box 575, Channahon, IL 60410 for the East Galena Blvd. and New York St. Sewer Separation from Root St. to Smith St. project in the amount of $3,947,079.00. The Project is located in Wards 2 and 7

PURPOSE:
The East Galena Blvd. and New York St. Sewer Separation from Root St. to Smith St. project is the first phase of a larger project that disconnects existing surface drainage from combined sewers. The project limits are from Root St. east towards Smith St. for East Galena Blvd. and New York St. The project is connected with the two-way Galena Blvd. and New York St. conversion. The opportunity to direct surface drainage to a dedicated storm sewer system prior to the two-way conversion will reduce future disruptions to traffic patterns. This project meets part of the City of Aurora's objectives in the combined sewer overflow Long Term Control Plan.

BACKGROUND:
The two-way conversion of Galena Blvd. and New York St. provides an opportunity to combine traffic disruptions into one construction season by including the storm sewer installation proposed by this sewer separation project. This project is the first phase of a larger project that will disconnect surface drainage from the combined sewer system to a dedicated storm sewer that meets the objectives set forth in the City of Aurora's combined sewer overflow Long Term Control Plan. Plans were advertised for bid January 28, 2015, with a bid opening February 11, 2015. Superior Excavating Company submitted the lowest responsible bid at $3,947,079.00. Time constraints associated with the project to due to the size of the project require a March 9th start date, with an anticipated completion date of September 21st. The Contractor will coordinate with the two-way conversion Contractor on signal and striping installation.

DISCUS...