Legislation Details

File #: 26-0379    Version: Name: Lindsay Windows/55 S. Constitution/Final Plan Revision
Type: P&D Resolution Status: Final/Appealable
File created: 6/15/2026 In control: Building, Zoning, and Economic Development Committee
On agenda: 6/24/2026 Final action: 7/7/2026
Title: A Resolution Approving a Revision to the Final Plan on Lot 1 and 2 of Lindsay Window & Door Subdivision, located at 55 S. Constitution Drive for a Processing, finishing and assembly facilities (3140) Use, Business and professional, office (2400) Use, and Retail sales or service (2100) Use
Attachments: 1. Exhibit "A-1" Final Plan - 2026-06-15 - 2026.138, 2. Exhibit "A-2" Landscape Plan - 2026-06-23 - 2026.138, 3. Exhibit "A-3" Building Elevations - 2026-06-24 - 2026.138, 4. Land Use Petition and Supporting Documents - 2026-05-04 - 2026.138, 5. Fire Access Plan - 2026-05-04 - 2026.138, 6. Insulation Panel Specs - 2026-06-16 - 2026.138, 7. Appeal Sheet - 2026-06-18 - 2026.138, 8. Location Map - 2026-06-18 - 2026.138, 9. Legistar History Report - 2026-06-18 - 2026.138
cover
TO: Mayor John Laesch

FROM: Planning and Zoning Commission

DATE: June 18, 2026

SUBJECT:
A Resolution Approving a Revision to the Final Plan on Lot 1 and 2 of Lindsay Window & Door Subdivision, located at 55 S. Constitution Drive for a Processing, finishing and assembly facilities (3140) Use, Business and professional, office (2400) Use, and Retail sales or service (2100) Use (Lindsay Windows - 26-0379 / AU19/1-26.138 - Fpn/R - JM - Ward 5)

PURPOSE:
The Petitioner, Lindsay Windows, is requesting approval of a Final Plan Revision for Lindsay Window & Door Subdivision located at 55 S. Constitution Drive which includes an addition to the existing building on Lot 1 and a new commercial building on Lot 2.

BACKGROUND:
The Subject Property is zoned B-2(C), Business District - General Retail with a Conditional Use Planned Development. City Council approved Ordinance O20-048 a Conditional Use Planned Development Revision for the property on August 11, 2020. The Plan Description permitted Lot 1 to be utilized as a Processing, finishing and assembly facilities use to allow Lindsay Windows to relocate their operation to this location in Aurora. The Resolution R20-157 approving the Final Plan for the lot showed the existing building along with a small 26,000 addition to the front of the building and a fenced storage area on the north side of the building. Loading docks were shown on the back of the building and on the south side of the building abutting the church property. An approximate 10,000 future retail building was also approved with that Final Plan. In 2023, the City approved resolution PDFNL23-014, a Final Plat subdividing the existing one lot into two lots. Lot 1, which is approximately 8.5 acres, contains the existing building and parking lot, as well as the planned future additions. Lot 2, which is approximately 1 acre, contains the future commercial building.

The Petitioner is now requesting approval of a Final Plan Revision for Lindsay Window &...

Click here for full text