Aurora, Illinois

File #: 23-0049    Version: 1 Name: The Tito Group LLC / 1350 N. Orchard Road / Final Plan
Type: P&D Resolution Status: Final/Appealable
File created: 1/17/2023 In control: Building, Zoning, and Economic Development Committee
On agenda: 1/25/2023 Final action: 2/7/2023
Title: A Resolution Approving a Final Plan on Lot 7 of Orchard Road Subdivision located at 1350 N. Orchard Road
Attachments: 1. Exhibit "A-1" Final Plan - 2023-01-20 - 2023.010, 2. Exhibit "A-2" Landscape Plan - 2023-01-20 - 2023.010, 3. Exhibit "A-3" Building Elevations - 2023-01-20 - 2023.010, 4. Fire Plan - 2023-01-20 - 2023.010, 5. Land Use Petition and Supporting Documents - 2023-01-05 - 2023.010, 6. Appealable Sheet - 2023-01-19 - 2023.010, 7. Plat of Survey - 2023-01-05 - 2023.010, 8. Maps
cover
TO: Mayor Richard C. Irvin

FROM: Tracey M. Vacek, Senior Planner

DATE: January 17, 2023

SUBJECT:
A Resolution Approving a Final Plan on Lot 7 of Orchard Road Subdivision located at 1350 N. Orchard Road (The Tito Group, LLC - 23-0049 / SG12/4-23.010 - Fpn - TV - Ward 5)

PURPOSE:
The Petitioner, The Tito Group, LLC, is requesting approval of a Final Plan for Lot 7 of Orchard Road Subdivision located at 1350 N. Orchard Road which includes the construction of retail building.

BACKGROUND:
The Subject Property is currently a vacant lot with PDD Planned Development District zoning. This property is part of the USAA Planned Development District and was designated for commercial when it was preliminary planned and platted in May of 2000.

The Petitioner is requesting approval of a Final Plan for Lot 7 of Orchard Road Subdivision. The details of the request include the construction of a retail building. The first phase of construction will be a 5,053 square foot single user retail building located at the northwest portion of the property along with the construction of 47 parking spaces, of which 2 spaces will be handicapped. These spaces will be located to the north and east of the proposed building. The proposal includes two north/south access drives which will extend to the north property line, one of which will align with the access drive to the south in front of the Home Depot while the other access drive will be on the back side of the proposed building along the west property line. There will also be one east/west access drive to the internal private drive which is located on the far east side of the property. A row of parking on the far east side of the property will remain which is being used as overflow parking for the strip center in front of this lot along Orchard Road.

The building elevation consists of different types of fiber cement panels. The Petitioner is proposing to clad the front building elevation with a smooth panel in a moo...

Click here for full text