Attachments: 1. Exhibit A - 25-003 Proof of Advertisement - 2025 Citywide Pavement Patching for Water and Sewer Maintenance, 2. Exhibit B - 25-003 Bid Tab - 2025 Citywide Pavement Patching for Water and Sewer Maintenance, 3. Exhibit C - 25-003 Submitted Bid - 2025 Citywide Pavement Patching for Water and Sewer Maintenance
cover
TO: Mayor Richard C. Irvin

FROM: Kurt Muth, P.E., Engineering Coordinator

DATE: February 10, 2025

SUBJECT:
A resolution to award the 2025 Citywide Pavement Patching for Water and Sewer Maintenance to Schroeder Asphalt Services, Inc.


PURPOSE:
This is an annual project that is required to patch pavement in the public right of way that was damaged in relation to utility repairs such as water main breaks and sanitary sewer repairs.


BACKGROUND:
This project was bid publicly, with an advertisement in the Aurora Beacon News on January 12th, 2025. The proof of the advertisement is attached as Exhibit A. Bids were received, opened, and read aloud publicly on January 29th, 2025. Four bids were received with the tabulation of those bids attached hereto and incorporated as Exhibit B. The lowest responsible bid was from Schroeder Asphalt Services, Inc. in the amount of $1,006,500.00. A copy of the submitted bid is attached as Exhibit C. The lowest bid came in approximately 0.6% below the engineer's estimate. It is anticipated that a small portion of this contract will be used to address individual utility repairs performed by contractors to take advantage of better restoration prices. A portion of this contract will also be used to remove and replace sidewalk squares that have been identified as trip hazards.

This bid is required to follow the City's Local Preference Ordinance, however, there was only one bid received from a certified local vender, Geneva Construction, Co. of Aurora, IL, in the amount of $1,137,275.00, 11.5% higher than the lowest bid which is outside the percentage which would allow them to match the lowest bid.

DISCUSSION:
This Citywide project will benefit the entire community, as it is the only contract that will be in place to repair the roadways that are damaged throughout the year due to utility repairs. This work is budgeted on an annual basis. This contract shall have a maximum value of $1,006,500.00 budgeted in 2025 with funds co...