Aurora, Illinois

File #: 16-00038    Version: 1 Name:
Type: Resolution Status: Passed
File created: 1/13/2016 In control: City Council
On agenda: 2/22/2016 Final action: 3/8/2016
Title: A Resolution to authorize a Professional Services Agreement for professional engineering consulting services for several maintenance and improvement projects for the Water Production Division
Attachments: 1. WPD Projects - CMT Agreement - FINAL - 01-29-16.pdf
cover
TO: Mayor Thomas J. Weisner

FROM: David E. Schumacher, P.E.; Superintendent of Water Production

DATE: January 29, 2016

SUBJECT:
Resolution to authorize a Professional Services Agreement for professional engineering consulting services for several maintenance and improvement projects for the Water Production Division

PURPOSE:
To obtain City Council approval to attain a professional engineering services agreement with Crawford, Murphy & Tilly, Inc., Aurora, IL (CMT) for professional engineering consulting services for several Water Production Division (WPD) maintenance and improvement projects.

BACKGROUND:
The City of Aurora's Water Production Division is responsible for operating and maintaining the Water Treatment Plant, River Intake, and more than twenty additional remote well and booster station sites. As these locations are aging, upkeep, maintenance, and improvements on these various sites must be performed to keep the city's capital investments in operating condition. Some necessary work, due to the expected costs, must be publically bid requiring formal public bidding documents be created.


DISCUSSION:
CMT has been performing professional engineering services for the WPD for approximately 25 years. This agreement provides for basic general engineering and computer modeling services, as requested by the WPD, for several maintenance and improvement projects. These services may include surveying, drafting, electrical, structural, mechanical, construction observation, and computer modeling services as needed for each proposed project.

CMT would be assisting in the initial analysis, design, creation of basic memorandum of design documents for the WPD's use, creation of public bidding documents if needed, and potentially construction inspection for the following WPD maintenance and improvement projects:

1. Update of existing city water distribution system hydraulic model
2. Well No. 18 valve repairs/replacements
3. W...