TO: Mayor Richard C. Irvin and City Council

FROM: Tim Weidner, P.E., Engineering Coordinator

DATE: May 16, 2024

SUBJECT:
A Resolution authorizing the City of Aurora to enter into a crossing surface installation agreement with BNSF Railway Company for improvements of the crossing of Indian Trail and the BNSF Railroad.

PURPOSE:
To enter into a crossing surface installation agreement with BNSF for the Indian Trail crossing.

BACKGROUND:
The project has secured federal funding to cover up to 80% of Construction and Construction Engineering costs. The funding sources include Surface Transportation Program - Local (STU) and Congestion Mitigation and Air Quality (CMAQ). A total of $3,800,000.00 in federal funds has been secured for Construction and Construction Engineering on the project.

The project involves modernizing the signalized intersections along Indian Trail between Edgelawn Dr and Highland Ave. Modernization includes replacement of all aging signal equipment, widening of curb radii to meet design vehicle requirement, and improving pedestrian facilities to meet ADA compliance. The intersections will feature new signal heads with 4-face flashing yellow turn arrows, which are currently in use on Orchard Rd and are proposed in other upcoming projects throughout the City. Additionally, the existing roadway and 8-10 foot wide bike path will be resurfaced as part of this project. Additional general information and exhibits can be found on the project website (https://www.aurora-il.org/2365/Indian-Trl-from-Edgelawn-Dr-to-Highland-).

The City is continuing work with their selected design consultant, Stanley Engineering, on final design plans under a previous City agreement. The plans are 99% complete and the "Initial Final" Plans, Specifications, and Estimates (PS&E) were submitted to IDOT on November 27, 2023. The project is likely targeting a September 2024 IDOT letting, pending final land acquisition certification and railroad agreement approval.