Title: A Resolution authorizing the execution of a Joint Funding Agreement with the State of Illinois, the execution of a Phase 3 Construction Engineering Services Agreement with HR Green, Inc. in the not to exceed amount of $473,545.00 and the appropriation of $1,600,000.00 of REBUILD Illinois Bond Funds for the Indian Trail (Edgelawn to Highland) Signal Modernization and Resurfacing Project.
Attachments: 1. Exhibit 'A' - Joint Funding Agreement (BLR 05310C), 2. Exhibit 'B' - Engineering Agreement (BLR 05530), 3. Exhibit 'C' - Resolution (BLR09110), 4. Exhibit 'D' - QBS Results, 5. Exhibit 'E' - Selected Plan Sheets
cover
TO: Mayor Richard C. Irvin

FROM: Tim Weidner, P.E., Engineering Coordinator

DATE: November 30, 2023

SUBJECT:
A Resolution authorizing the execution of a Joint Funding Agreement with the State of Illinois, the execution of a Phase 3 Construction Engineering Services Agreement with HR Green, Inc. in the not to exceed amount of $473,545.00 and the appropriation of $1,600,000.00 of REBUILD Illinois Bond Funds for the Indian Trail (Edgelawn to Highland) Signal Modernization and Resurfacing Project.

PURPOSE:
To execute the Joint Funding Agreement for State-Let Construction Work there by reserving sufficient funds to cover the local agency share of the project cost by resolution, to approve the Phase 3 Construction Engineering Services Agreement with HR Green, Inc and to Appropriate REBUILD Illinois Bond Funds by Illinois Department of Transportation (IDOT) Resolution.

BACKGROUND:
A Phase 1 Study has been completed for this project, and the City is in various stages of design and construction for similar projects throughout the Indian Trail Corridor.

The project has secured federal funding to cover up to 80% of Construction and Construction Engineering costs. The funding sources include Surface Transportation Program - Local (STU) and Congestion Mitigation and Air Quality (CMAQ). A total of $3,800,000.00 in federal funds has been secured for Construction and Construction Engineering on the project.

The project involves modernizing the signalized intersections along Indian Trail between Edgelawn Dr and Highland Ave. Modernization includes replacement of all aging signal equipment, widening of curb radii to meet design vehicle requirement, and improving pedestrian facilities to meet ADA compliance. The intersections will feature new signal heads with 4-face flashing yellow turn arrows, which are currently in use on Orchard Rd and are proposed in other upcoming projects throughout the City. Additionally, the existing roadway and 8-10 foot wide bike path will b...