Aurora, Illinois

File #: 24-0436    Version: 1 Name:
Type: Resolution Status: Passed
File created: 6/4/2024 In control: City Council
On agenda: 6/25/2024 Final action: 6/25/2024
Title: A Resolution authorizing the Director of Purchasing to Process a Change Order to the Agreement with Ratio Architects, LLC for the RiverEdge Park Phase II Expansion PSA in the amount of $440,200.
Attachments: 1. Ratio Change Order 1, 2. 230613 RiverEdge Site Plan Graphic
cover
TO: Mayor Richard C. Irvin

FROM: Jason Bauer, Assistant Director of Public Works, Assistant City Engineer

DATE: June 4, 2024

SUBJECT:
A resolution authorizing the Director of Purchasing to Process a Change Order to the Agreement with Ratio Architects, LLC for the RiverEdge Park Phase II Expansion PSA in the amount of $440,200.

PURPOSE:
Authorize additional design services for the expansion of RiverEdge Park.

BACKGROUND:
Ratio is currently under contract for the design of the RiverEdge Park Phase II Expansion. When the original agreement was executed, the final scope of the construction was not fully known. During concept development, the actual scope for each location was refined, resulting in an expansion of the backstage building based on artist needs, increasing the size of the structure from a 3,000 SF single story building, to a two-story building with approximately 10,000 SF of total space, also based on configuration of the backstage area, this was converted from an expansion of the CSO building to a new separate structure. The south gate was reconfigured and the beverage pavilion was increased in size threefold and modified to include a new VIP seating area. Renderings of the final concepts are attached.

DISCUSSION:
The new agreement value of $1,435,850.00, is an increase of $440,200.00 over the initial agreement of 995,650.00 (R23-289). While the fees have increased, the actual design percentage has reduced from 10.6% to 8.7% and the structures have increased from a total square footage of 7,200 Square Feet to 24,372 Square Feet. The funds are available in account 355-4440-451.73-43 (A062). Based on the current schedule, work on the backstage building will commence this fall, with the remaining buildings and site work commencing in early 2025, with an anticipated completion of fall 2025. There are sufficient funds in the 2024 budget for the work to be completed this year, with additional funds scheduled for the 2025 budget cycle. ...

Click here for full text