Legislation Details

File #: 26-0328    Version: 2 Name:
Type: Resolution Status: Consent Agenda
File created: 5/14/2026 In control: City Council
On agenda: 6/23/2026 Final action:
Title: A Resolution to award Hazel CSO Sewer Separation, Sanitary Extension, and Water Main Improvements project, located in Ward 4 to Performance Construction & Engineering, LLC. in the bid amount of $4,618,028.00.
Attachments: 1. Exhibit A - Engineering Plan Set - Hazel CSO Sewer Separation, Sanitary Extension, and Water Main Improvements, 2. Exhibit B - Posted Bid Document - Hazel CSO Sewer Separation, Sanitary Extension, and Water Main Improvements, 3. Exhibit C - Bid Tabulation - Hazel CSO Sewer Separation, Sanitary Extension, and Water Main Improvements, 4. Exhibit D - Performance Construction and Engineering Bid Submittal - Hazel CSO Sewer Separation, Sanitary Extension, and Water Main Improvements, 5. Exhibit E - Performance Construction
cover
TO: Mayor John Laesch

FROM: Kurt Muth, P.E., Asst. Dir. Public Works / Asst. City Engineer

DATE: June 8, 2026

SUBJECT:
A Resolution to award the Hazel CSO Sewer Separation, Sanitary Extension, and Water Main Improvements project, located in Ward 4 to Performance Construction & Engineering, LLC, in the bid amount of $4,618,028.00.

PURPOSE:
To upsize the existing 4" DIP water main, separate the storm sewer from the Hazel Combined Sewer Outfall, and extend the sanitary sewer to separate the sanitary services.

BACKGROUND:
The location of the water main to be replaced can be seen in the attachment, Exhibit A - Engineering Plan Set. Water services from the existing water main will be replaced and switched over to the new main, most of which are currently lead service lines and will be fully replaced to the meter with homeowner approval.

DISCUSSION:
A total of three bids were received, opened, and reviewed on May 13, 2026. The lowest bid came in at 1.56% lower than the Engineer's estimate. Attached are Exhibits B & C, the posted bid document and the bid tabulation. Performance Construction & Engineering, LLC 's submitted bid can be seen in the attached Exhibit D, and their verification of good standing in Exhibit E. The lowest responsible bid received was in the amount of $4,618,028.00 by Performance Construction & Engineering, LLC. The water main improvements will be funded with account 510-4058-511-73-02 (IC076 & IC080) for $1,014,978.00 & $1,219,850.00 respectively which has a 2026 total budgeted amount of $5,250,000.00 (IC076) & $7,500,000 (IC080), the sewer separation will be funded with account 281-1856-512-73-09 (B031) for $1,837,844.00 which has a 2026 total budgeted amount of $2,800,000.00, and the sanitary extension will be funded with account 510-4063-511-73-14 (IB018) for $545,356.00 which has a 2026 total budgeted amount of $3,000,000.00.

This project was subject to the Local Preference Ordinance, however no local contractors submitted.

IMPACT...

Click here for full text