Title: A Resolution to award the Broadway Avenue Sewer Separation project located in Ward 2 to Berger Contractors Inc. in the bid amount of $1,094,089.25.
Attachments: 1. Exhibit A - Broadway Location Map, 2. Exhibit B - Broadway Ad for Bid, 3. Exhibit C - Broadway Ave Bid Tabulation, 4. Exhibit D - Broadway Ave Sewer Separation Bid Documents, 5. Exhibit E - Berger Submitted Bid
cover
TO: Mayor Richard C. Irvin

FROM: Kurt Muth, P.E., Engineering Coordinator

DATE: June 10, 2024

SUBJECT:
A Resolution to award the Broadway Avenue Sewer Separation project located in Ward 2 to Berger Contractors Inc. in the bid amount of $1,094,089.25.

PURPOSE:
To install new storm sewers removing stormwater from the combined sewer system on Broadway Avenue (IL Rte 25) between Spring Street and E. Downer Place ahead of the streetscape project anticipated in early 2025. Storm sewer will also be extended on E. New York Street to pick up the stormwater structures at the LaSalle intersection.

BACKGROUND:
New storm sewers will be installed to remove surface drainage flows from the combined sewer system. A location map is attached as Exhibit A to show the limits of the project. This project will help satisfy the requirements associated with the City's Long Term Control Plan and the City's Illinois Environmental Protection Agency Combined Sewer System Overflow. Minor water main and sanitary sewer repairs and modifications will also occur in the corridor.

DISCUSSION:
The proposed improvements have been publicly advertised and bid in conformance with City procedures. The advertisement for bid is attached as Exhibit B. Seven conforming bids were received, publicly opened and read aloud on May 29, 2024. The bid tabulation and Berger Contractors Inc's bid are attached as Exhibits C and E. A copy of the bid documents is also attached as Exhibit D.

This project was subject to the Local Preference Ordinance, however no local contractors submitted.

Portions of the project are accounted for within three 2024 budgets. $150,000 within account 510-4058-511-73-02 (IC072, $5,000,000.00 Water Main Replacement), $45,000 within account 510-4063-511-73-14 (IB018, $2,500,000.00 Sanitary Sewer Rehabilitation), and the remaining $899,089.25 within account 281-1856-512-73-09 (B031, $3,550,000.00 LTCP Improvements - Sewer Separation).

IMPACT STATEMENT:
Traffic will be narrowe...