TO: Mayor Richard C. Irvin
FROM: Planning Commission
DATE: January 19, 2018
SUBJECT:
A Planning and Development Committee Resolution Approving the Final Plat for CyrusOne Subdivision, Phase Two located south of Diehl Road, north and south of the Prairie Path, west of 2905 Diehl Road (CyrusOne, LLC - 17-01179 / NA07/2-17.225-Fsd/Fpn - TV - WARD 10)
PURPOSE:
The Petitioner CyrusOne, LLC is requesting approval of a Final Plat for CyrusOne Subdivision, Phase Two located south of Diehl Road, north and south of the Prairie Path, west of 2905 Diehl Road which includes a three lot subdivision for a data center, stormwater management facility, and a future residential lot.
BACKGROUND:
The Subject Property is zoned ORI Office, Research, and Light Industrial District, OS-1 Conservation, Open Space, and Drainage District, and E Estate Single Family Detached Dwelling District zoning. Additional information on the legislative history of the property can be found in the attached Property Information Sheet.
The Petitioner is requesting approval of a Final Plat for CyrusOne Subdivision, Phase 2. The details of the request include a 3-lot subdivision with 40 feet of right of way dedication along Molitor Road. Lot 1 of CyrusOne Subdivision, Phase 2, located along the north side of the Prairie Path, is being combined with the existing lot to the east, being Lot 1 of CyrusOne Subdivision. This lot consists of the existing and a newly proposed data center. Lot 2, located along Diehl Road, consists of a detention facility and Lot 3, located south of the Prairie along Molitor Road, consists of a future residential lot.
Concurrently with this proposal, the Petitioner is also requesting approval of a Final Plan for Lots 1 and 2 of CyrusOne Subdivision, Phase 2. The details of the request include the construction of a 2-story data center with a 113 space surface parking lot on Lot 1, southeast of the existing data center. The building is approximately 316,000 sq. f...