Title: A Resolution ratifying the execution of a change order for the Development Services Center HVAC Improvements Project in the amount of $84,022.00.
Attachments: 1. Artlip_AHU Fan Rebuild, 2. 1627 - Change Order 001, 3. 1627 - Change Order 002r1, 4. 1627-Project Cost Summary

cover

TO:                     Mayor John Laesch

 

FROM:                     Derrick Winston, Director of Public Facilities

 

DATE:                     October 20, 2026

 

SUBJECT:

A Resolution Ratifying the Execution of a Change Order for the Development Services Center HVAC Improvements project in the amount of $84,022.00.

 

PURPOSE:

To increase the contract amount for the Development Services Center HVAC Controls Improvements project from the original $664,500.00 to $748,522.00.

 

BACKGROUND:

On February 10, 2026, the City Council approved acceptance of the low bid from Artlip and Sons, Inc., for HVAC improvements at the Development Service Center for $664,000.00 ($25,000.00 project allowance included), with a project contingency of $33,225.00 (R26-024).  The project commenced on April 7, 2026 and included the replacement of up to sixty-four (64) electronic dual duct air boxes, thermostats, and the installation of Tridium Building Automated System (BAS) controls throughout the facility.

 

The project has proceeded as planned except for the following:

 

The existing air handling unit (AHU) fan assembly, not included in the project scope, unexpectedly began exhibiting signs of failure and was rebuilt for $31,708.00, drawing from the project contingency (proposal attached).

 

Two dual duct boxes, not included in the project scope, were replaced for $21,509.00, drawing from the included project allowance (change order 001 attached).

 

A concealed dual duct box, that feeds both the 1st and 2nd floor conference rooms was discovered, the main blower motor, which began exhibiting signs of failure, to be replaced along with the addition of a variable frequency drive (VFD), and the addition of an existing baseboard heater to the automated control network.  These items along with the associated thermostat and controls modifications add $84,022 (87,513.00, less the remaining project allowance of $3,491.00) to the original contract (change order 002r1 attached).

 

On October 19, 2026, the previously mentioned blower motor failed.  Given the forecasted low temperatures and to ensure the facility's operational continuity, the motor was replaced that evening.

 

DISCUSSION:

With the approval and implementation of contract change order 002r1, for $84,022.00, the updated project total would become $780,230.00, which is 17.4% beyond the original contract amount of $664,500.00 (a project cost summary is attached).

 

Funding to satisfy the requested contract change will be drawn from account 340-4411-417.38-05.

 

IMPACT STATEMENT:

N/A

 

RECOMMENDATIONS:

That the City Council adopts a resolution ratifying the execution of a change order for the Development Services Center HVAC Improvements Project in the amount of $84,022.00.

 

 

cc:                     Infrastructure and Technology

 

CITY OF AURORA, ILLINOIS

 

RESOLUTION NO. _________

DATE OF PASSAGE ________________

title

A Resolution ratifying the execution of a change order for the Development Services Center HVAC Improvements Project in the amount of $84,022.00.

body

WHEREAS, the City of Aurora has a population of more than 25,000 persons and is, therefore, a home rule unit under subsection (a) of Section 6 of Article VII of the Illinois Constitution of 1970; and

 

WHEREAS, subject to said Section, a home rule unit may exercise any power and perform any function pertaining to its government and affairs for the protection of the public health, safety, morals, and welfare; and

 

WHEREAS, On February 10, 2026, the City Council approved acceptance of the low bid from Artlip and Sons, Inc., for HVAC improvements at the Development Service Center for $664,000.00 ($25,000.00 project allowance included), with a project contingency of $33,225.00 (R26-024); and

 

WHEREAS , The project commenced on April 7, 2026 and included the replacement of up to sixty-four (64) electronic dual duct air boxes, thermostats, and the installation of Tridium Building Automated System (BAS) controls throughout the facility; and

 

WHEREAS,  The project has proceeded as planned except for the following:

The existing air handling unit (AHU) fan assembly, not included in the project scope, unexpectedly began exhibiting signs of failure and was rebuilt for $31,708.00, drawing from the project contingency  -  Two dual duct boxes, not included in the project scope, were replaced for $21,509.00, drawing from the included project allowance  -  A concealed dual duct box, that feeds both the 1st and 2nd floor conference rooms was

discovered, the main blower motor, which began exhibiting signs of failure, to be placed     

along with the addition of a variable frequency drive (VFD), and the addition of an existing baseboard heater to the automated control network.  These items along with the associated thermostat and controls modifications add $84,022 (87,513.00 less the remaining project allowance of $3,491.00) to the original contract; and

 

WHEREAS, On October 19, 2026, the previously mentioned blower motor failed.  Given the forecasted low temperatures and to ensure the facility's operational continuity, the motor was replaced that evening; and

 

WHEREAS, Funding to satisfy the requested contract change will be drawn from account 340-4411-417.38-05; and

 

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Aurora, Illinois, as follows: ratifying the execution of a change order for the Development Services Center HVAC Improvements Project in the amount of $84,022.00 and the Director of Purchasing is hereby authorized to execute the necessary orders.