File #: 23-0076    Version: 1 Name:
Type: Resolution Status: Passed
File created: 1/27/2023 In control: City Council
On agenda: 2/28/2023 Final action: 2/28/2023
Title: A Resolution authorizing the execution of a Phase 1 Preliminary Engineering Agreement with Stanley Consultants, Inc. in the amount not to exceed $371,344.00, and the appropriation of $371,344.00 of MFT Funds for the Farnsworth Signal - I-88 to Sheffer Road Project.
Attachments: 1. Exhibit A - Draft BLR 05530 Engineering Agreement, 2. Exhibit B - Draft BLR 09110 Resolution, 3. Exhibit C - QBS Results, 4. Exhibit D - Location Map

cover

TO:                     Mayor Richard C. Irvin

 

FROM:                     Tim Weidner, P.E., Engineering Coordinator

 

DATE:                     February 16, 2023

 

SUBJECT:

A Resolution authorizing the execution of a Phase 1 Preliminary Engineering Agreement with Stanley Consultants, Inc. in the amount not to exceed $371,344.00, and the appropriation of $371,344.00 of MFT Funds for the Farnsworth Signal - I-88 to Sheffer Road Project.

 

PURPOSE:

This is a Resolution to approve the above referenced Engineering Services Agreement and to appropriate Motor Fuel Tax (MFT) funds as required by the Illinois Highway Code for Section 23-00359-00-TL.

 

BACKGROUND:

The City applied for federal funding in the March 2022 Kane-Kendall Council of Mayors (KKCOM) Call for Projects and secured funding for 9 different projects, with 5 additional projects placed in the contingency program.  This project was selected to be in KKCOM's 5-year program for Construction funds to be used in 2027.  In order to remain on schedule, it is necessary to start the Phase 1 Preliminary Engineering Study at this time.

 

The project will include modernizing the six (6) traffic signals on Farnsworth Ave from the northern I-88 ramp to Sheffer Rd. The corridor will also be resurfaced from north of Molitor Rd to Creek Ave with intersection radii improvements as needed and ADA ramp replacement. A multi-use path will be included from the Illinois Prairie Path to Creek Ave. A Location Map is included as Exhibit 'D'. The funding ratio for these projects is 80/20 (80% federal / 20% local) for Construction and Construction Engineering, up to a maximum amount of $2,500,000.  Signal modernization and resurfacing projects like this help reduce the burden of funding the City’s yearly resurfacing program with local and MFT funding sources.  Much of the traffic signal equipment is old and outdated, and this project will replace all that equipment in the corridor using federal funds.

 

DISCUSSION:

The City published a Qualifications Based Selection (QBS) for these Phase 1 Engineering services on October 27, 2022. Eight (8) firms submitted their qualifications and experience. Staff reviewed the qualifications and determined that Stanley Consultants, Inc. of Chicago, IL was the most qualified with the top 3 firm's scores attached as Exhibit 'C'. Exhibit 'C' also has a breakdown of the selection criteria and weighting.

 

The attached Phase 1 Preliminary Engineering Agreement (BLR 05530) from Stanley Consultants, Inc. in the amount of $371,344.00 noted as Exhibit 'A' will provide Phase 1 Preliminary Engineering Services. We are anticipating the preliminary design work to be completed in summer 2024, with Phase 2 design work to follow.

 

The agreement being presented is only for Phase 1 Engineering.  The QBS included a provision that the City can utilize the same firm for the Phase 2 Design Engineering as Phase 1 Engineering.  Provided the consultant's work is satisfactory, a separate resolution for the Phase 2 Engineering will be prepared at a later time for Council's approval.

 

This followed the Request for Qualifications process and is not subject to the Local Preference Policy. The funding source, MFT funds, is not subject to the Local Preference Policy.

 

IDOT requires a Resolution to Appropriate the MFT Funds prior to their expenditure for approved projects.  The Resolution for Improvement - BLR 09110 (Exhibit 'B') appropriating MFT Funds in the amount of $371,344.00 is attached.

 

The 2023 City Budget provides $349,000 for this item in Account 203-4020-418.76-39 (GC088, Farnsworth Avenue Signal - Bilter to Sheffer).  As this is a multi-year project, any additional funds will be budgeted in future years, if required.

 

IMPACT STATEMENT:

No impact.

 

RECOMMENDATIONS:

Please forward this to Finance Committee for approval.

 

 

cc:                     Finance Committee

 

CITY OF AURORA, ILLINOIS

 

RESOLUTION NO. _________

DATE OF PASSAGE ________________

title

A Resolution authorizing the execution of a Phase 1 Preliminary Engineering Agreement with Stanley Consultants, Inc. in the amount not to exceed $371,344.00, and the appropriation of $371,344.00 of MFT Funds for the Farnsworth Signal - I-88 to Sheffer Road Project.

body

WHEREAS, the City of Aurora has a population of more than 25,000 persons and is, therefore, a home rule unit under subsection (a) of Section 6 of Article VII of the Illinois Constitution of 1970; and

 

WHEREAS, subject to said Section, a home rule unit may exercise any power and perform any function pertaining to its government and affairs for the protection of the public health, safety, morals, and welfare; and

 

WHEREAS, the City intends to modernize the Farnsworth Ave traffic signals from I-88 to Sheffer Rd, resurface from north of Molitor Rd to Creek Ave, add a multi-use path from Illinois Prairie Path to Creek Ave, and update ADA ramps with federal funds; and

 

WHEREAS, there is a need to execute a Phase 1 Preliminary Engineering with Stanley Consultants, Inc., 8501 W. Higgins Rd, Suite 730, Chicago, IL 60631 in the amount of $371,344.00, a copy of which agreement is attached hereto and incorporated herein as Exhibit 'A'; and

 

WHEREAS, there is a need to appropriate Motor Fuel Tax (MFT) Funds (MFT Section # 23-00359-00-TL) for this project in the amount of $371,344.00, a copy of which resolution is attached as Exhibit 'B' for approval; and

 

The 2023 City Budget provides $349,000 for this item in Account 203-4020-418.76-39 (GC088, Farnsworth Avenue Signal - Bilter to Sheffer), with any additional funds to be budgeted in future years, if required.

 

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Aurora, Illinois, as follows: that the Phase 1 Preliminary Engineering Agreement with Stanley Consultants, Inc. attached to this Resolution as Exhibit 'A' in the not to exceed amount of three hundred seventy-one thousand three hundred forty-four dollars and zero cents ($371,344.00) shall be and hereby is approved; and further

 

BE IT RESOLVED, that three hundred seventy-one thousand three hundred forty-four dollars and zero cents ($371,344.00) of available MFT Funds, Motor Fuel Tax Section Number 23-00359-00-TL shall be and hereby is appropriated for the purposes set forth in this resolution; and further

 

BE IT RESOLVED, that the Director of Purchasing, Mayor and the Clerk respectively, shall be and hereby are directed to execute all the aforementioned documents on behalf of the City and any other documents required to carry the purposes of this resolution into execution, including, but not limited to the document entitled “Resolution for Improvement Under the Illinois Highway Code, Form (BLR 09110)” attached to this Resolution as Exhibit 'B'.