Aurora, Illinois

File #: 19-0581    Version: Name: Pulte Home Company, LLC - Final Plan - SWC of Meadowridge Drive and 75th Street
Type: P&D Resolution Status: Final/Appealable
File created: 7/3/2019 In control: City Council
On agenda: 8/27/2019 Final action: 8/20/2019
Title: A Building, Zoning and Economic Development Resolution Approving a Final Plan on Lots 1-21 of Meadow Ridge Subdivision, located at the southwest corner of Meadowridge Drive and 75th Street, for a ROW Dwelling (Party Wall) (1130) Use
Attachments: 1. Exhibit "A-1" Final Plan - 2019-08-06 - 2019.100.pdf, 2. Exhibit "A-2" Landscape Plan - 2019-08-06 - 2019.100.pdf, 3. Exhibit A-3" Building and Signage Elevations - 2019-08-06 - 2019.100.pdf, 4. Land Use Petition and Support Documents - 2019-07-02 - 2019.100.pdf, 5. Property Research Sheet #67244 - 2019-03-26 - 2017.234.pdf, 6. Plat of Survey - 2019-07-02 - 2019.100.pdf, 7. Fire Acess Plan - 2019-07-02 - 2019.100.pdf, 8. Legistar History Report (Final Plan) - 2019-08-08 - 2019.100.pdf

cover

TO:                     Mayor Richard C. Irvin

 

FROM:                     Planning Commission

 

DATE:                     August 8, 2019

 

SUBJECT:

A Resolution Approving a Final Plan on Lots 1-21 of Meadow Ridge Subdivision, located at the southwest corner of Meadowridge Drive and 75th Street, for a ROW Dwelling (Party Wall) (1130) Use  (Pulte Home Company, LLC - 19-0581 / NA28/3-19.100-Fsd/Fpn - JM - Ward 8)   

 

PURPOSE:

The Petitioner Pulte Home Company, LLC is requesting approval of a Final Plan for Lots 1-21 of Meadow Ridge Subdivision located at the southwest corner of Meadowridge Drive and 75th Street for a ROW Dwelling (Party Wall) (1130) Use which includes the development of 80 front-loaded townhomes and associated stormwater detention.  

 

BACKGROUND:

The Subject Property is currently Vacant Land with R-4A(S) Two-Family Dwelling District with a Special Use and OS-1(S) Conservation, Open Space, and Drainage District with a Special Use zoning, which is part of the Ocean Atlantic Woodland Corporation Special Use Planned Development. Additional information on the legislative history of the property can be found in the attached Property Information Sheet. 

 

The Petitioner is requesting approval of a Final Plan for Lots 1-21 of Meadow Ridge Subdivision.  The details of the request include the development of 18 townhome buildings containing 80 units. The stormwater detention is located at the corner of 75th Street and Meadowridge Drive. The development is accessed by a road south of the detention that runs in a circle around the townhome development creating a center open area that will contain four buildings. The townhomes to the north of the internal road feature a 40 foot setback to provide buffer from the adjacent 75th Street. The rear of the townhomes to the east of the internal road overlook the detention facility. The townhomes to the south abut a park. Three corners of the road contain a private drive to access three additional buildings. All the units are front-loaded with a two-car wide driveway that is 25 feet deep. The buildings are a mixture of four units, located in the center and to the south, with the remainder being five units and one six unit. Some units will have the option to add a sunroom and all units will have the option of a habitable attic.

 

The Landscape Plan provides buffering to 75th Street and to the business complex to the west through the use of a six foot fence and a mixture of canopy and evergreen trees. The site features a mixture of trees and shrubs along Meadowridge Drive, abutting the park and at the development’s entrance.

 

The Building Elevations depict a traditional townhome design featuring varying roofline through the use of projecting gables and a mixture of shed and gable dormers. The building is clad with brick around the garage with a mixture of vertical and horizontal siding on the second-story. The Signage shows a sign with a brick base and limestone engraved with the development’s name.

 

Concurrently with this proposal, the Petitioner is requesting approval of a Final Plat for Lots 1-21 of Meadow Ridge Subdivision. The project includes a subdivision into 21 lots with 18 being for development of townhomes, two for blanket city easements, and one for a stormwater detention facility. This request also includes granting to the developer the City’s authority to install utilities upon any existing easement. The contemplated utilities for the development is being serviced by a connection to existing utilities located on property to the east within an existing Blanket Utility Easement approved by the McCarty Center Plat of Subdivision. The existing easement provides the City the ability to construct and install utilities within the easement. This resolution grants that ability to the Developer, which allows them to construct the contemplated easements for this development. 

 

DISCUSSION:

Staff has reviewed the Final Plan petition and have sent comments back to the petitioner on those submittals.  The petitioner has made the requested revisions to these documents and they now meet the applicable codes and ordinances, with the exception of the items reflected in the conditions listed in the Staff Recommendation below. 

 

POLICIES AND GUIDELINES:

The Staff’s Evaluation and Recommendation are based on the following Physical Development Policies:

 

10.0 To provide for the orderly, balanced and efficient growth and redevelopment of the

City through the positive integration of land use patterns, functions, and circulation systems. To protect and enhance those assets and values that establishes the desirable quality and general livability of the City. To promote the City’s position as a regional center.

11.1(5) To guide and promote development to areas where public utilities, public roads and municipal services are either available or planned.

11.1(3) To encourage new development contiguous to existing development.  

 

RECOMMENDATIONS:

The Planning Commission recommended CONDITIONAL APPROVAL of A Resolution Approving a Final Plan on Lots 1-21 of Meadow Ridge Subdivision, located at the southwest corner of Meadowridge Drive and 75th Street, for a ROW Dwelling (Party Wall) (1130) Use, with the following conditions:

 

1.) That all the comments of the Engineering Division be addressed prior to approval of Final Engineering. 

 

ATTACHMENTS:

EXHIBITS:

Exhibit "A-1" Final Plan

Exhibit "A-2" Landscape Plan

Exhibit “A-3” Building and Signage Elevations

Fire Access Plan

Land Use Petition with Supporting Documents

Property Research Sheet

Legistar History Report

 

Legistar Number: 19-0581

 

 

cc:                     

Alderman Michael B. Saville, Chairperson

Alderman Sherman Jenkins, Vice Chairperson

Alderman Carl Franco

Alderman Robert J. O’Connor

Alderman Juany Garza

 

 

CITY OF AURORA, ILLINOIS

 

RESOLUTION NO. _________

DATE OF PASSAGE ________________

title

A Building, Zoning and Economic Development Resolution Approving a Final Plan on Lots 1-21 of Meadow Ridge Subdivision, located at the southwest corner of Meadowridge Drive and 75th Street, for a ROW Dwelling (Party Wall) (1130) Use  

body

WHEREAS, the City of Aurora has a population of more than 25,000 persons and is, therefore, a home rule unit under subsection (a) of Section 6 of Article VII of the Illinois Constitution of 1970; and

 

WHEREAS, subject to said Section, a home rule unit may exercise any power and perform any function pertaining to its government and affairs for the protection of the public health, safety, morals, and welfare; and

 

WHEREAS, by petition dated July 2, 2019, Pulte Home Company, LLC filed with the City of Aurora a petition requesting approval of a Final Plan for Lots 1-21 of Meadow Ridge Subdivision located at the southwest corner of Meadowridge Drive and 75th Street for a ROW Dwelling (Party Wall) (1130) Use and related required documents as attached hereto as Exhibits "A-1" through Exhibit “A-3”; and

 

WHEREAS, after referral of said petition from the Aurora City Council, the Aurora Planning Commission on August 7, 2019, reviewed the petition and recommended CONDITIONAL APPROVAL of said petition; and

 

WHEREAS, on August 14, 2019, the Building, Zoning and Economic Development Committee of the Aurora City Council reviewed said Final Plan and the before mentioned recommendations and recommended CONDITIONAL APPROVAL of said petition; and

 

WHEREAS, the decision of the Building, Zoning and Economic Development  Committee with respect to a final plan is subject to appeal to the City Council in the manner set forth in the City of Aurora Zoning Ordinance; and

 

WHEREAS, no person authorized under City of Aurora Zoning Ordinance to appeal such decision having done so in the manner set forth in the Ordinance, the Decision of the Building, Zoning and Economic Development  Committee constitutes final action on the proposed final plan; and  

 

NOW, THEREFORE, BE IT RESOLVED that the Building, Zoning and Economic Development Committee of the City of Aurora, Illinois, finds as facts all of the preamble recitals of this Resolution and hereby grants CONDITIONAL APPROVAL of said Final Plan with the following conditions:

 

1.) That all the comments of the Engineering Division be addressed prior to approval of Final Engineering.

 

BE IT FURTHER RESOLVED that the Building, Zoning and Economic Development  Committee of the City of Aurora hereby adopts the Final Plan and related required documents, as attached hereto as Exhibit "A-1" Final Plan, Exhibit “A-2” Landscape Plan, and Exhibit “A-3” Building and Signage Elevations, along with any easement dedications or vacations deemed necessary by the Aurora City Engineer.