File #: 24-0073    Version: 1 Name:
Type: Resolution Status: Passed
File created: 1/31/2024 In control: City Council
On agenda: 2/27/2024 Final action: 2/27/2024
Title: A Resolution authorizing the Mayor and City Clerk to execute a not-to-exceed agreement for Design Phase Engineering and Planning Special Services in the amount of $114,500 for the Rehabilitate Airfield Lighting Vault (ARR-4915) and Replace Vault Generator (ARR-5117) projects located at the Aurora Municipal Airport with Crawford, Murphy and Tilly, Inc.
Attachments: 1. ARR Lighting Vault, 2. ARR-4915 ARR-5117 cover letter Rehab. Vault Replace Generator DPS SS Engr. Agrmt. 12.26.23, 3. Aurora Municipal Airport IDOT FY-2024 Airport Improvement Program Letter (1) 7-1-2023, 4. Aurora Municipal Airport IDOT FY-2024 Airport Improvement Program Letter (2) 7-1-2023, 5. ARR-4915 ARR-5117 Rehab. Vault Replace Generator Design and Special Servcies Engr. Agrmt 12.26.23 CMT Exec

cover

TO:                     Mayor Richard C. Irvin

 

FROM:                     Steve Andras, P.E., Airport Manager

 

DATE:                     February 1, 2024

 

SUBJECT:

A resolution authorizing a not-to-exceed agreement in the amount of $114,500 between Crawford, Murphy and Tilly, Inc. and the City of Aurora for Design Phase Engineering and Planning Special Services associated with two projects located at the Aurora Municipal Airport.

 

PURPOSE:

To obtain City Council approval to enter into a consultant agreement with Crawford, Murphy and Tilly, Inc. to provide Design Phase Engineering and Planning Special Services.

 

BACKGROUND:

The City of Aurora has been awarded funding for two projects located at the Aurora Municipal Airport.  The first is the Rehabilitate Airfield Lighting Vault project in which the total cost for this project is $785,000.  The City's Local Share is $39,250.  The second project is related to the first project in that it is the replacement of the existing standby generator which provides electrical power to the airfield lighting system in case of a network utility outage.  The replacement generator total project cost is $515,000.  As a result of the federal Bipartisan Infrastructure Law (BIL) funding, the City of Aurora's share for this project is $25,750.  Both project cost breakdowns are included in the attachments.

 

DISCUSSION:

As indicated above, the City of Aurora's total share for both of these projects is limited to $65,000.  Therefore $49,500 of the total design phase engineering fee will be reimbursed back to the City of Aurora at the completion of these projects. The total cost for both projects has been set aside under CIPs D052 and D057 in accounts 504-4454-433.73-99 and 504-4454-433.63-34 respectively.

 

IMPACT STATEMENT:

This project (s) will have no adverse impact to the City of Aurora and will reduce the ongoing cost of maintaining the airport infrastructure.

 

RECOMMENDATIONS:

We respectfully request that you forward this agreement to the Building, Zoning and Economic Development Committee for their review and recommendation.

 

 

cc:                     Building, Zoning and Economic Development Committee

 

CITY OF AURORA, ILLINOIS

 

RESOLUTION NO. _________

DATE OF PASSAGE ________________

title

A Resolution authorizing the Mayor and City Clerk to execute a not-to-exceed agreement for Design Phase Engineering and Planning Special Services in the amount of $114,500 for the Rehabilitate Airfield Lighting Vault (ARR-4915) and Replace Vault Generator (ARR-5117) projects located at the Aurora Municipal Airport with Crawford, Murphy and Tilly, Inc.

body

WHEREAS, the City of Aurora has a population of more than 25,000 persons and is, therefore, a home rule unit under subsection (a) of Section 6 of Article VII of the Illinois Constitution of 1970; and

 

WHEREAS, subject to said Section, a home rule unit may exercise any power and perform any function pertaining to its government and affairs for the protection of the public health, safety, morals, and welfare; and

 

WHEREAS, the City of Aurora owns operates and maintains the Aurora Municipal Airport; and

 

WHEREAS, the City of Aurora desires to Rehabilitate the Airfield Lighting Vault and Replace the Vault Generator; and

 

WHEREAS, the Rehabilitate Airfield Lighting Vault and Replace Vault Generator projects will be funded by Federal and State agencies with the City of Aurora's total project share being $65,000; and

 

WHEREAS, the 2024 budget provides funding for this project under CIP D052 in account no. 504-4454-433.73-99 and CIP D057 in account no. 504-4454-433.63-34.

 

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Aurora, Illinois, as follows: that the Mayor and City Clerk are hereby authorized and directed to  execute a not-to-exceed agreement for Design Phase Engineering and Planning Special Services in the amount of $114,500 for the Rehabilitate Airfield Lighting Vault (ARR-4915) and Replace Vault Generator (ARR-5117) projects located at the Aurora Municipal Airport with Crawford, Murphy and Tilly, Inc.