Aurora, Illinois

File #: 19-0211    Version: 1 Name:
Type: Resolution Status: Passed
File created: 3/14/2019 In control: City Council
On agenda: 4/9/2019 Final action: 4/9/2019
Title: A Resolution to Award the contract for the Basins 54 & 56 Sanitary Manhole Rehabilitation project to Kim Construction Company Inc., 3142 Holeman, P.O. Box 276, Steger, IL 60475 in the amount of seven hundred fifty-six thousand, eight hundred eighty-five dollars and zero cents ($756,885.00).
Attachments: 1. Exhibit A - MH rehab Location Map.pdf, 2. Exhibit B - MH Rehab Ad for Bid.pdf, 3. Exhibit C - Basins 54 & 56 MH Rehab Bid Tab.pdf, 4. Exhibit D - Kim Const Submitted Bid.pdf

cover

TO:                     Mayor Richard C. Irvin

 

FROM:                     Kurt Muth, P.E., Engineering Coordinator

 

DATE:                     March 25, 2019

 

SUBJECT:

A resolution to award the Basins 54 & 56 Sanitary Manhole Rehabilitation project to Kim Construction Company Inc., 3142 Holeman, P.O. Box 276, Steger, IL 60475 located in Wards 8 and 10.

 

PURPOSE:

To repair 500 manholes in sanitary sewer basins 54 & 56 to address structural deficiencies and reduce inflow and infiltration (I&I).

 

BACKGROUND:

The location of the sanitary manholes in basins 54 & 56 to be repaired can be seen in the attached Exhibit A - Location Map.  Basins 54 & 56 are located in wards 8 and 10 and are generally bound by the EJ&F railroad to the west, the BNSF railroad to the north, Illinois Route 59 to the east, and City limits to the south.  The sanitary system tributary to Fox Metro's waubonsie interceptor which roughly follows Waubonsie Creek experiences significant inflow and infiltration which causes capacity issues downstream during wet conditions and significant rain events.  Basins 54 and 56 are near the upstream end of the interceptor tributary area and were identified as prime location to reduce I&I.  As a result, an engineering consultant was hired to inspect the manholes for structural deficiencies and issues causing the I&I.  This contract will address the repair recommendations provided for approximately 500 manholes.  That accounts for roughly a third of the manholes in these two basins.

 

DISCUSSION:

Five bids were received, opened, and read aloud on March 13, 2019.  The bid tabulation can be seen in the attached Exhibit C.  The lowest responsible bid in the amount of $756,885.00 was submitted by Kim Construction Company Inc. The sanitary sewer improvements will be funded with account 510-4063-511-73-14 (IB018) which has a 2019 budget amount of $3,000,000.00.  Also included as Exhibits B & D are the advertisement for bid and Kim Construction Company Inc.'s submitted bid.  Kim Construction has previously performed satisfactory work in the City and specializes in this type of manhole rehabilitation.

 

This project was subject to the Local Preference Ordinance however the local contractor was greater than four percent higher than the lowest responsible bidder.

 

IMPACT STATEMENT:

There will be lane closures throughout basins 54 & 56 during the duration of the project as the individual manholes are repaired.

 

RECOMMENDATIONS:

I request the proposed resolution be adopted.

 

 

cc:                     Buildings, Grounds, and Infrastructure Committee

 

CITY OF AURORA, ILLINOIS

 

RESOLUTION NO. _________

DATE OF PASSAGE ________________

title

A Resolution to Award the contract for the Basins 54 & 56 Sanitary Manhole Rehabilitation project to Kim Construction Company Inc., 3142 Holeman, P.O. Box 276, Steger, IL 60475 in the amount of seven hundred fifty-six thousand, eight hundred eighty-five dollars and zero cents ($756,885.00).

body

WHEREAS, the City of Aurora has a population of more than 25,000 persons and is, therefore, a home rule unit under subsection (a) of Section 6 of Article VII of the Illinois Constitution of 1970; and

 

WHEREAS, subject to said Section, a home rule unit may exercise any power and perform any function pertaining to its government and affairs for the protection of the public health, safety, morals, and welfare; and

 

WHEREAS, these two basins (54 & 56) are tributary to Fox Metro's waubonsie interceptor which has issues with inflow and infiltration that are compromising the capacity of the sewer system;

 

WHEREAS, approximately a third of the manholes in basins 54 & 56 were found to have structural deficiencies or issues contributing inflow and infiltration to the sanitary system;

 

WHEREAS, Kim Construction Company Inc. submitted the lowest responsible bid out of 5 bids received, opened and read aloud on March 13, 2019;

 

WHEREAS, the sanitary sewer improvements have been funded in the 2019 budget within account 510-4063-511-73-14 ($3,000,000.00, IB018).

 

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Aurora, Illinois, as follows: that the Director of Purchasing is hereby authorized to execute a contract with Kim Construction Company Inc., 3142 Holeman, P.O. Box 276, Steger, IL 60475 in the amount of seven hundred fifty-six thousand, eight hundred eighty-five dollars and zero cents ($756,885.00).