Aurora, Illinois

File #: 15-00773    Version: 1 Name:
Type: Resolution Status: Passed
File created: 8/20/2015 In control: City Council
On agenda: 2/23/2016 Final action: 3/8/2016
Title: A Resolution to Authorize a Professional Services Agreement for design and construction observation services for the Lime Residual Underground Injection Control project for the Water Production Division
Attachments: 1. UIC - DEI Engineering Agreement - FINAL - 01-10-16.pdf, 2. Lime Residual UIC Presentation - FINAL - 02-23-16.pdf

cover

TO:                     Mayor Thomas J. Weisner

 

FROM:                     David E. Schumacher, P.E.; Superintendent of Water Production

 

DATE:                     February 16, 2016

 

SUBJECT:

Resolution to authorize a Professional Services Agreement for design and construction observation services for the Lime Residual Underground Injection Control project for the Water Production Division.

 

PURPOSE:

To obtain City Council approval to attain a professional engineering services agreement with Deuchler Environmental, Inc., Aurora, IL (DEI) for design and construction observation services for the Lime Residual Underground Injection Control project for the Water Production Division.

 

BACKGROUND:

All residents of the City of Aurora are provided with potable water from the city owned and operated Water Treatment Plant (WTP).  The main treatment process utilized at the WTP is the lime-softening process.  This process not only removes and collects the solid particles that are present in the raw water sources (Fox River, shallow well, and deep well water), but also softens the water to provide customers with more aesthetically pleasing drinking water.  As the solid particles are removed by the treatment process, they are concentrated and collected and this by-product must be ultimately disposed.

 

Since the WTP's construction in 1992, the lime residual has been disposed by landfilling at great annual expense to the city.  In 2012, through an IEPA permit, the WPD began a program to dispose of the lime residual via land application on agricultural fields.  Land application allows a beneficial reuse of the waste product and reduces the cost of ultimate disposal by approximately 25%.  As this process is still expensive, starting in 2006, a more efficient method of ultimate disposal was investigated regarding placing the lime residual in repurposed portions of a limestone mine.

 

 

DISCUSSION:

The LaFarge-Conco Limestone Mine (LC-Mine) is located at the intersection of Interstate 88 and IL Highway 25.  The mine is approximately 200 to 400 feet below grade, is located in both Aurora and North Aurora, and is mainly used to produce limestone and dolomite aggregates for construction uses.  The portion of the mine located in Aurora is typically referred to as the south mine and currently has two distinct levels with a third level to be constructed in the future.  The first two levels of the mine are almost spent (completely excavated) and thus are no longer useful for material production.

 

As such, the city and LaFarge have been in discussions for quite some time to develop a plan to allow the lime residual material to be placed into the first two levels of the south mine as a method of ultimate disposal.  In order to proceed with the placement of the material, a permit from the Illinois Environmental Protection Agency is required.  Through a lengthy process and via Permit No. UIC-015-COA, the Illinois Environmental Protection Agency has approved the underground injection of the lime residual into the spent portions of the L-C Mine as a method of ultimate disposal.  This permit became effective on August 24, 2015.

 

The city wishes to begin detailed design and construction of the necessary facilities and thus a proposal was received from DEI for design and construction observation services for the various necessary phases of construction for the overall project. 

 

Funding for the professional services and a portion of the construction of this project has been requested in the 2016 City Budget as CIP #I044.  The remainder of the funding for the actual construction of the improvements, which are currently scheduled to begin in early 2017, have been requested in the 2017 Budget also as part of CIP #I044.

 

IMPACT STATEMENT:

Based on information provided by DEI, they estimate that the city will save approximately $1,100,000 annually by changing the ultimate disposal of the by-product material from land application and land filling to underground injection in the repurposed sections of the L-C Mine.

 

RECOMMENDATIONS:

That the Mayor and City Council approve the attached resolution authorizing the Purchasing Director to execute an agreement with Deuchler Environmental, Inc., for design and construction observation services for the Lime Residual Underground Injection Control project on a time-and-material basis, for a not-to-exceed amount, of $1,060,000.00 for the Water Production Division.  It is further recommended that this matter be forwarded to the joint meeting of the Buildings, Grounds, and Infrastructure and Finance Committee's for review and recommendation.

 

 

cc:                     Alderman Garza, Chairman
                     Alderman Mesiacos
                     Alderman Johnson
                     Alderman Bohman, Alternate

 

 

Alderman O’Connor, Chairman
                     Alderman Mervine
                     Alderman Bohman
                     Alderman Mesiacos, Alternate

 

 

CITY OF AURORA, ILLINOIS

 

RESOLUTION NO. _________

DATE OF PASSAGE ________________

title

A Resolution to Authorize a Professional Services Agreement for design and construction observation services for the Lime Residual Underground Injection Control project for the Water Production Division

body

WHEREAS, the City of Aurora has a population of more than 25,000 persons and is, therefore, a home rule unit under subsection (a) of Section 6 of Article VII of the Illinois Constitution of 1970; and

 

WHEREAS, subject to said Section, a home rule unit may exercise any power and perform any function pertaining to its government and affairs for the protection of the public health, safety, morals, and welfare; and

 

WHEREAS, the Aurora Water Treatment Plant produces a lime by-product from the lime softening process which must be ultimately disposed; and

 

WHEREAS, underground injection of the material into a repurposed limestone mine is expected to be less costly over the life of the space available compared to the current disposal practice of land application and landfilling; and

 

WHEREAS, a permit has been received from the Illinois Environmental Protection Agency to allow the by-product material to be placed into select areas of the mine; and

 

WHEREAS, a proposal has been received from Deuchler Environmental, Inc., to provide professional engineering services for design and construction observation for the project; and

 

Whereas, budgetary authority is granted and funds are available in the 2016 City Budget account No. 510-4058-511-73-07;

 

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Aurora, Illinois, as follows: The Purchasing Director is hereby authorized to execute a professional engineering services agreement with Deuchler Environmental, Inc., for design and construction observation services, on a time-and-material basis, for an amount not-to-exceed $1,060,000.00 for the Lime Residual Underground Injection Control project.