Skip to main content

Aurora, Illinois

File #: 26-0137    Version: 1 Name:
Type: Resolution Status: Forwarded to Committee of the Whole
File created: 2/25/2026 In control: Infrastructure and Technology Committee
On agenda: 3/9/2026 Final action:
Title: A Resolution authorizing the Director of Purchasing to enter into an agreement with Schroeder Asphalt Services, Inc. in the amount of $1,058,300.00 for the 2026 Citywide Pavement Patching for Water and Sewer Maintenance.
Attachments: 1. Exhibit A - Proof of Advertisement - 2026 Citywide Pavement Patching for Water and Sewer Maintenance, 2. Exhibit B - Posted Bid Document - 2026 Citywide Pavement Patching for Water and Sewer Maintenance, 3. Exhibit C - Bid Tabulation - 2026 Citywide Pavement Patching for Water and Sewer Maintenance, 4. Exhibit D - Submitted Bid - 2026 Citywide Pavement Patching for Water and Sewer Maintenance

cover

TO:                     Mayor John Laesch

 

FROM:                     Kurt Muth, P.E., Engineering Coordinator

 

DATE:                     March 9, 2026

 

SUBJECT:

A resolution to award the 2026 Citywide Pavement Patching for Water and Sewer Maintenance to Schroeder Asphalt Services, Inc.

 

 

PURPOSE:

This is an annual project that is required to patch pavement in the public right of way that was damaged in relation to utility repairs such as water main breaks and sanitary sewer repairs.

 

BACKGROUND:

The proof of the advertisement is attached as Exhibit A.  Two bids were received, opened, and reviewed on February 25, 2026. The posted bid document is attached as Exhibit B. The tabulation of those bids attached hereto and incorporated as Exhibit C. The lowest responsible bid was from Schroeder Asphalt Services, Inc. in the amount of $1,058,300.00. A copy of the submitted bid is attached as Exhibit D.  The lowest bid came in approximately 0.5% below the engineer's estimate.  It is anticipated that a small portion of this contract will be used to address individual utility repairs performed by contractors to take advantage of better restoration prices. A portion of this contract will also be used to remove and replace sidewalk squares that have been identified as trip hazards.

 

This bid is required to follow the City's Local Preference Ordinance, however, there was only one bid received from a certified local vender, Geneva Construction, Co. of Aurora, IL, in the amount of $1,154,850.00, 8.7% higher than the lowest bid which is outside the percentage which would allow them to match the lowest bid.

 

DISCUSSION:

This Citywide project will benefit the entire community, as it is the only contract that will be in place to repair the roadways that are damaged throughout the year due to utility repairs.  This work is budgeted on an annual basis. This contract shall have a maximum value of $1,058,300.00 budgeted in 2026 with funds coming from the entire amount budgeted in Account Number 510-4063-511-38-38 ($695,000.00), $223,300.00 from Account Number 510-4063-511-73-14 (Sanitary Sewer Evaluation and Repair, IB018) and $140,000 from Account Number 340-4060-431-38-61 (CIP# E004).

 

 

IMPACT STATEMENT:

Construction is expected to begin in early-April and will continue throughout the construction season depending on the number of utility repairs that are completed.  Impacts to the public will be minimal, though will consist of short-term lane closures associated with the pavement repairs and in certain cases, loss of driveway access to allow adequate time for a concrete apron or curb to cure (when applicable).

 

RECOMMENDATIONS:

I request the proposed resolution awarding the contract to Schroeder Asphalt Services, Inc. in the bid amount of $1,058,300.00 be adopted.

 

 

cc:                     Infrastructure & Technology Committee

 

CITY OF AURORA, ILLINOIS

 

RESOLUTION NO. _________

DATE OF PASSAGE ________________

title

A Resolution authorizing the Director of Purchasing to enter into an agreement with Schroeder Asphalt Services, Inc. in the amount of $1,058,300.00 for the 2026 Citywide Pavement Patching for Water and Sewer Maintenance.

body

WHEREAS, the City of Aurora has a population of more than 25,000 persons and is, therefore, a home rule unit under subsection (a) of Section 6 of Article VII of the Illinois Constitution of 1970; and

 

WHEREAS, subject to said Section, a home rule unit may exercise any power and perform any function pertaining to its government and affairs for the protection of the public health, safety, morals, and welfare; and

 

WHEREAS, it is necessary and desirable to repair roadways that are damaged in relation to underground utility repairs; and

 

WHEREAS, Schroeder Asphalt Services, Inc. submitted the lowest responsible bid out of two bids received, opened and reviewed on February 25, 2026 in the bid amount of $1,058,300.00; and

 

WHEREAS, this contract shall have a maximum value of $1,058,300.00 budgeted in 2026 with funds coming from the entire amount budgeted in Account Number 510-4063-511-38-38 ($695,000.00), $223,300.00 from Account Number 510-4063-511-73-14 (Sanitary Sewer Evaluation and Repair, CIP# IB018), and $140,000 from Account Number 340-4060-431-38-61 (CIP# E004).

 

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Aurora, Illinois, as follows: The Director of Purchasing is hereby authorized to enter into an agreement with Schroeder Asphalt Services, Inc. in the bid amount of $1,058,300.00 for the 2026 Citywide Pavement Patching for Water and Sewer Maintenance.