Aurora, Illinois

File #: 15-00114    Version: 1 Name: T. E. G. Agreement for Galena Blvd Sewer Separation
Type: Resolution Status: Passed
File created: 2/12/2015 In control: City Council
On agenda: 3/10/2015 Final action: 3/10/2015
Title: A Resolution authorizing the Director of Purchasing and the City Clerk to enter into an agreement with Thomas Engineering Group to provide Construction Engineering Services for the East Galena Blvd Sewer Separation Project.
cover
TO:      Mayor Thomas J. Weisner
 
FROM:      Lonnie Avery, P.E., Utility Construction Coordinator
 
DATE:      February 12, 2015
 
SUBJECT:
A resolution authorizing the Director of Purchasing and the City Clerk to enter into an agreement with Thomas Engineering Group to provide construction engineering services for the East Galena Blvd Sewer Separation Project.
 
PURPOSE:
To enter into an agreement with Thomas Engineering Group for the above referenced project.
 
BACKGROUND:
In March 2010, the City of Aurora submitted a Combined Sewer Overflow Long Term Control Plan (CSO LTCP) in accordance with the requirements set forth by the Clean Water Act.  The City owns 15 permitted combined sewer overflow.  CSO #8, located near East Benton Street and the East Branch of the Fox River, is one of the City's most active overflows and contributes a large volume of overflow into the Fox River.  These improvements will de-combine storm sewer flows tributary to overflow #8.  The construction of these improvements will be performed by Superior Excavating Company.  This agreement with Thomas Engineering Group will provide on-site construction engineering services.
 
DISCUSSION:
The improvements to be constructed as part of this project will reduce sewage backups into residential basements, reduce street flooding, and reduce the discharge of untreated sewage into the Fox River.
 
Thomas Engineering Group has proposed to provide full construction engineering services and ensure the completion of the work in accordance with the plans and specification for an amount not to exceed $364,181.00.  The 2015 budget provides funding for this work in B031 account #281-1856-512.73-09.
 
IMPACT STATEMENT:
These improvements will ultimately reduce the frequency of back-ups into residential basements, street flooding, and overflows to the Fox River.
 
RECOMMENDATIONS:
Please forward this request to the Building, Grounds, and Infrastructure Committee for their review and approval.
 
 
cc:      Alderman Peters, Chairman
      Alderman Garza
      Alderman Bugg
      Alderman Saville, Alternate
 
 
 
CITY OF AURORA, ILLINOIS
 
RESOLUTION NO. _________
DATE OF PASSAGE ________________
title
A Resolution authorizing the Director of Purchasing and the City Clerk to enter into an agreement with Thomas Engineering Group to provide Construction Engineering Services for the East Galena Blvd Sewer Separation Project.
body
WHEREAS, the City of Aurora has a population of more than 25,000 persons and is, therefore, a home rule unit under subsection (a) of Section 6 of Article VII of the Illinois Constitution of 1970; and
 
WHEREAS, subject to said Section, a home rule unit may exercise any power and perform any function pertaining to its government and affairs for the protection of the public health, safety, morals, and welfare; and
 
WHEREAS, it is necessary and desirable to provide on-site construction engineering services for the installation of storm sewers; and
 
WHEREAS, there is a need for a Construction Engineering Agreement with Thomas Engineering Group to provide On-Site Engineering Services for the East Galena Blvd Sewer Separation Project in an amount not to exceed $364,181.00 in accordance with the agreement attached hereto and incorporated herein as Exhibit "A"; and
 
WHEREAS, funds have been provided for this work in the 2015 budget in B031, account #281-1856-512.73-09; and
 
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Aurora, Illinois, as follows: The Director of Purchasing and the City Clerk are hereby authorized to enter into an agreement with Thomas Engineering Group of 762 Shoreline Drive, Suite 200, Aurora, IL. 60504 to provide on-site construction engineering services for the East Galena Blvd Sewer Separation Project per the attached agreement contained herein as Exhibit "A".