Aurora, Illinois

File #: 17-00773    Version: 1 Name:
Type: Resolution Status: Passed
File created: 8/14/2017 In control: City Council
On agenda: 9/12/2017 Final action: 9/12/2017
Title: A Resolution Authorizing a Contract with H. Linden & Sons Sewer and Water, Inc. in the amount of three hundred and forty-two thousand, two hundred and ninety-eight dollars and zero cents ($342,298.00) for the N. LaSalle Street Sewer Separation & Overlay Project located between E. New York Street and Spring Street in Ward 2
Attachments: 1. Exhibit A - Location Map.pdf, 2. Exhibit B - Advertisement.pdf, 3. Exhibit C - N LaSalle St Bid Tabulation.pdf, 4. Exhibit D - Linden Submitted Bid.pdf

cover

TO:                     Mayor Richard C. Irvin

 

FROM:                     Jason Bauer, P.E., Engineering Coordinator

 

DATE:                     August 21, 2017

 

SUBJECT:

A Resolution to award the North LaSalle Street Sewer Separation and Overlay project to H. Linden & Sons Sewer and Water, Inc.- Ward 2

 

PURPOSE:

To install new storm sewer removing stormwater along this block of North LaSalle Street from the combined sewer system, abandon the existing 4" water main, install new curb and gutter, and overlay the existing brick roadway with a bituminous asphalt surface.

 

BACKGROUND:

This block of North LaSalle Street was previously identified as needing roadway improvements.  Prior to bidding out the project, the status of the existing utilities were evaluated.  The existing 4" water main has a few abandoned water services still connected to it and has little benefit to the system while currently only serving one hydrant.  It was decided to install a new hydrant off of the Spring Street water main and abandon the 4" water main on North LaSalle Street.  In addition, this block of North LaSalle is one of only a few areas in the neighborhood that still have inlets connected to the combined sewer system.  New storm sewer will be installed to remove the drainage flows from the combined sewer system.

 

DISCUSSION:

The project is budgeted for in 2017 within accounts 281-1856-512-73-09 (B031, $112,703.00 sewer separation), 510-4063-511-73-02 (B047, $54,525.00 water main), and 340-4460-431-7391 (CAPA, $175,070.00 roadway).  The proposed improvements have been publicly advertised and bid in conformance with City procedures.  The advertisement for bid is attached as Exhibit B.  Five conforming bids were received, publicly opened and read aloud on August 9, 2017.  The low bidder, H. Linden & Sons has successfully completed similar projects for the City in the past.  The bid tabulation and H. Linden & Son's bid are attached as exhibits C and D.

 

IMPACT STATEMENT:

This block of North LaSalle Street will be closed to traffic during construction, but the increase in traffic on the neighboring blocks will be negligible.  The water will also be temporarily shut down twice as the existing 4" water main is abandoned. There will also be temporary lane closures on Spring Street and E. New York Street when the water main disconnections and the storm sewer connection is installed.  These lane closures will not last more than one day at a time.

 

RECOMMENDATIONS:

I request the proposed resolution be adopted.

 

 

cc:                     Alderman Garza, Chairman
                     Alderman Donnell
                     Alderman Bohman
                     Alderman Hart-Burns, Alternate

 

 

CITY OF AURORA, ILLINOIS

 

RESOLUTION NO. _________

DATE OF PASSAGE ________________

title

A Resolution Authorizing a Contract with H. Linden & Sons Sewer and Water, Inc. in the amount of three hundred and forty-two thousand, two hundred and ninety-eight dollars and zero cents ($342,298.00) for the N. LaSalle Street Sewer Separation & Overlay Project located between E. New York Street and Spring Street in Ward 2..

body

WHEREAS, the City of Aurora has a population of more than 25,000 persons and is, therefore, a home rule unit under subsection (a) of Section 6 of Article VII of the Illinois Constitution of 1970; and

 

WHEREAS, subject to said Section, a home rule unit may exercise any power and perform any function pertaining to its government and affairs for the protection of the public health, safety, morals, and welfare; and

 

WHEREAS, this block of N. LaSalle was identified as needing storm sewer, water main, and roadway improvements; and

 

WHEREAS, the proposed improvements have been publicly advertised and bid in conformance with City procedures; and

 

WHEREAS, five conforming bids were received and read aloud on August 9, 2017 with H. Linden & Sons Sewer and Water, Inc. 722 E. South St., Unit D, Plano, IL 60545 submitting the lowest responsible bid in the amount of 342,298.00; and

 

WHEREAS, the project is budgeted for in 2017 within accounts 281-1856-512-73-09 (B031, $112,703.00 sewer separation), 510-4063-511-73-02 (B047, $54,525.00 water main), and 340-4460-431-7391 (CAPA, $175,070.00 roadway).

 

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Aurora, Illinois, as follows: That the Director of Purchasing is hereby authorized to execute a contract with H. Linden & Sons Sewer and Water, Inc. in the amount of three hundred and forty-two thousand, two hundred and ninety-eight dollars and zero cents ($342,298.00).